38
2.
For the Installer
2.4.24 Wood gasification boiler: checking the cladding door switch
– When closing the cladding door, the cladding door switch must still have sufficient shifting travel after swit-
ching (audible clicking) before the cladding door is completely closed – Fig. 70. If necessary, use a screwdriver
at the top inside the control panel to reset – Fig. 71.
2.4.23 Wood gasification boiler: cladding adjustment
– Visually adjust side panels, cladding door, and control panel by the cladding door width or equal gap size, and
tighten all screws – Fig. 69.
Fig. 69 Adjusting cladding, tightening all screws
Fig. 70 Door switch must click
Fig. 71 Reset door switch with screws
Содержание DuoWIN
Страница 15: ...15 2 For the Installer ...
Страница 69: ...69 5 Technical Data ...