29
2.
For the Installer
2.4.13 Wood gasification boiler: control panel installation
– Place the control panel on the side panels. Attach it to each panel with 2 self-tapping screws and 1 saw tooth
ring for grounding – Fig. 45.
– Attach the cable channels at left and right (feed-through at rear) to the front of the control panel with a drilling
screw on each side; leave some overhang over the cladding at the rear (approx. 5 mm) – Fig. 45. Cable routing,
see Fig. 51 and Item 3.
Fig. 45 Loosely screw on the control panel; screw the cable channels tight.
1 x
1 x
1 x
Cable channels
1 x
ls
1 x
1 x
Feed-through
appr
ox.
5
mm
Содержание DuoWIN
Страница 15: ...15 2 For the Installer ...
Страница 69: ...69 5 Technical Data ...