36
2.
For the Installer
2.4.21 Wood gasification boiler: control panel installation
– Before the control panel is installed, the InfoWIN
PLUS
cable must be routed at the front left from the control
panel – Fig. 63.
– Route the cable from the door switch (on the control panel) at the front right into the control panel and connect
Plug X15 – Fig. 64.
– Loosely screw the control panel to the side panels (2 x) and control panel (2 x) with self-tapping screws –
Fig. 65.
– Connect the InfoWIN
PLUS
cable and route into the side panel – Fig. 65.
Fig. 63 Routing the InfoWIN
PLUS
cable
Fig. 64 Inserting the cable from the door
switch and connecting to Plug X15.
Door switch
cable and Plug
X15
Fig. 65 Attach the control panel with 4 self-tapping screws, route InfoWIN
PLUS
cable.
4 x
InfoWIN
PLUS
cable
InfoWIN
plug
Control panel
feed-through
Control panel
feed-through
Содержание DuoWIN
Страница 15: ...15 2 For the Installer ...
Страница 69: ...69 5 Technical Data ...