– Place the pellet boiler with its back to the left side panel of the wood gasification boiler. The pellet boiler must
make full contact with the positioning bracket – Fig. 100.
2.4.32 Align the pellet boiler to the wood gasification boiler
Information!
It is essential that both boilers are aligned precisely to each other, otherwise installation of the clad-
ding is difficult, i.e. the gap size is not correct.
Only for the 21/26 kW pellet boiler:
– remove the outside cable feed-through at the rear so that the pellet boiler can be placed right next to the wood
gasification boil
er – Fig. 99.
Fig. 99 Only for the 21/26 kW pellet boiler:
Remove cable feed-through
Information!
The pellet boiler must be prefitted hydraulically with pipes up to the rear panel of the wood gasifica-
tion boiler – see also section 2.4.29.