48
2.
For the Installer
– Only for the 15 kW pellet boiler:
punch out the cut-out on the cladding – Fig. 105.
Information!
Insert the cladding at top left
carefully
, to ensure that the integral fuel hopper is not scratched on
the front – Fig. 106..
– Carefully insert the cladding at top left, lay the mains power plug suction turbine cable into the notch, and
secure cladding with 4 self-tapping screws – Fig. 107.
2.4.33 Pellet boiler: Integral fuel hopper cladding
– Hook the assembly bracket at the rear of the integral fuel hopper into the bayonet locks – Fig. 103, 104.
Fig. 103 Hook the assembly bracket into place
Fig. 104 Bayonet lock
Fig. 105 Punch out the cut-out only for the
15 kW pellet boiler
Fig. 106
Poser le revêtement avec précaution
en haut à gauche
Fig. 107 Fixer le revêtement avec 4 vis à tôle
4 x
Notch for suction turbine cable