28
2.
For the Installer
2.4.12 Wood gasification boiler: side panels installation
–
Halfway
insert 2 screws on the bottom of each side of the base – Fig. 41. Release the side panels and hook
them into the inserted screws at the bottom (Fig. 42, 43). Loosely screw the top with one self-tapping screw
and one saw tooth ring for grounding - Fig. 44.
Fig. 41 Insert 2 screws on each side of the base
Fig. 42 Hooking side panels with screws
at the bottom
2 each of
Note!
Loosely
screw the cladding screws at first; do not adjust the cladding (gap size) or tighten screws
until all cladding parts have been installed.
Fig. 43 Hooking in side panels
Fig. 44 Loosely tightened screws at top of cladding.
1 x
1 x
Содержание DuoWIN
Страница 15: ...15 2 For the Installer ...
Страница 69: ...69 5 Technical Data ...