16
2.
For the Installer
2.4.2 Transport to installation site
To avoid damaging the combustion chamber and/or the parts slipping, the appliance must be transported into the
building and installed without significant knocks or jolts. The warranty will be invalid if the appliance is damaged
or malfunctions due to incorrect transportation or installation.
The wood gasification boiler may only be transported upright and without cladding. It is easiest to transport using
a lift truck or by rolling on pipes. It is best to transport the
boiler and integral fuel hopper
to the installation site
inside the crate
. If transporting via stairs etc., the boiler should be secured as is appropriate. For installation
dimensions and weights, see Fig. 8, 9, and section 5 of the technical data.
If it is not possible to transport inside the crate, we recommend using a hand cart and tension belt – see Fig. 14, 15.
Note!
A crane lug is on top of the boiler for transportation with winches. Pellet boiler: an M12 eyelet for a
crane hook (not included in the scope of supply) can be mounted to the threaded bolt of the screw
connection on the coasting surfaces cover. The weight can be reduced by removing easily dismantled
part
s (e.g. doors, hook-in plates, burn-through plates, heating surface cleaning, etc. ).
The boiler can be installed directly on a fire-resistant surface and does not require a special foundation.
Boiler and integral fuel hopper in the crate
612
812
1
1
6
1
660
767
6
8
2
1
Fig. 8
Pellet boiler
Integral fuel hopper
with/without pellet feed
Boiler and integral fuel hopper without crate
Fig. 9
714
650 (BW 102/152)
720 (BW 212/262)
1146
584
592
1231
584
592
1471
Pellet boiler
Integral fuel hopper
without pellet feed
Integral fuel hopper
with pellet feed
Содержание DuoWIN
Страница 15: ...15 2 For the Installer ...
Страница 69: ...69 5 Technical Data ...