18
2.
For the Installer
c) with eyelet and crane (not included in delivery)
Screw eyelet M12 (not included in scope of delivery) for the crane hook to the screw connection of the coasting
surface lid‘s threaded bolt. Lift boiler off pallet with the crane.
Fig. 16 Mount the eyelet (not included in
scope of delivery) for the crane hook
Fig. 17 Lift boiler off pallet
1 ........... Lower door hinge
2 ........... Carburisation gas duct
3 ........... Left side panel
4 ........... Right side panel
5 ........... Rear top wall
6 ........... Rear bottom wall
7 ........... Front boiler cover
8 ........... Rear boiler cover
9 ........... Hook-in plate ash pan
10 ......... Bottom insulation, left/right
11 ......... Top insulation, right
12 ......... Top insulation, left
13 ......... Insulation, left
14 ......... Top rear insulation
15 ......... Bottom rear insulation
16 ......... Top front insulation
17 ......... Cladding door
18 ......... Magnet retainer (2 pcs.)
19 ......... Carburisation gas duct attachment (2 pcs.)
20 ......... Control panel
21 ......... Upper door hinge
22 ......... Control panel
23 ......... Dog point screw (2 pcs.)
24 ......... Cable channel (2 pcs.)
25 ......... Lambda sensor
26 ......... Air control
27 ......... Set screws front (2 pcs.)
28 ......... Magnetic catch (2 pcs.)
29 ......... Blower seal
30 ......... Flue connection adapter – accessories
31 ......... Blower housing
32 ......... Flue gas blower
33 ......... Wing nugs
34 ......... Lighting door with automatic ignition – accessory
35 ......... Hanger – accessory
36 ......... Shaft for cleaning heating surfaces
37 ......... Shorter lever
38 ......... Lever for cleaning heating surfaces
2.4.3 Installation parts
Information!
All cladding parts must be fully fitted for air guidance and heat dissipation on the boiler.
Содержание DuoWIN
Страница 15: ...15 2 For the Installer ...
Страница 69: ...69 5 Technical Data ...