17
2.
For the Installer
b) with hand cart and tension belt
Fig. 10 Remove 2 screws and the side pie-
ces of wooden frame
Fig. 11 Use planks from crate as ramp
2.4.2.1 Remove boiler from pallet and transport to installation site
Information!
The base of the boiler is secured to the floor plate by 2 screws positioned on either side – Fig. 8.
a) by hand – Fig. 10–13.
b) with hand cart and tension belt – Fig. 14-15.
c) with eyelet and crane (not included in delivery) – Fig. 16-17.
a) by hand
Fig. 12 Grip position for auger tube and
flue outlets
Fig. 13 Push boiler off pallet
Fig. 14 Secure boiler to pushcart with
tension belt
Fig. 15 14 Lift the boiler off the pallet with
the hand cart
Содержание DuoWIN
Страница 15: ...15 2 For the Installer ...
Страница 69: ...69 5 Technical Data ...