25
2.
For the Installer
2.4.9 Wood gasification boiler: carburisation gas duct installation
– Screw in 2 fasteners for the carburisation gas duct over the heating door of the boiler, see Fig. 31, 32.
– Attach the carburisation gas duct and screw tight with 2 M8 nuts – Fig. 33.
Fig. 31 Installing 2 fasteners for
carburisation gas duct
Fig. 32 2 fasteners installed
Fig. 33 Installing the carburisation gas duct
2 x
Fasteners
Содержание DuoWIN
Страница 15: ...15 2 For the Installer ...
Страница 69: ...69 5 Technical Data ...