
35
2.
For the Installer
2.4.20 Wood gasification boiler: cleaning heating surfaces lever installation
– Push the heating surface cleaning lever into slot at front left of the side panel (Fig. 59). Screw to the shorter
lever with a hexagon screw M8x25, U-washer 8, and lock nut M8 –
DO NOT
tighten screw, as the rods must be
free to move (Fig. 60). Next, push down behind the side panel – Fig. 61.
Fig. 59 Insert the heating surface cleaning lever
into the slot in the side panel
Fig. 60 Screw levers together - do
not
tighten
screws - rods must be able to move
1 x
Fig. 61 Heating surface cleaning lever is mounted behind the side panel
– Screw both shafts together in the axle (limit stop must face upwards) using a cylinder screw with hexagon
socket M8x30. Do not screw the axle to the shaft – Fig. 62.
Fig. 62 Screw the shafts together in the axle
Limit stop
1 x
Axle
Содержание DuoWIN
Страница 15: ...15 2 For the Installer ...
Страница 69: ...69 5 Technical Data ...