Centurion Water Heater- Edge [ii]: Install-Operation-Service
SECTION 5: INITIAL START-UP
OMM-0153_A
• 8/25/2022 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page 43 of 131
5.2 TOOLS & INSTRUMENTS FOR COMBUSTION CALIBRATION
To properly perform combustion calibration, the proper instruments and tools must be used and
correctly attached to the unit. The following sections outline the necessary tools and
instrumentation as well as their installation.
5.2.1 Required Tools & Instrumentation
The following tools and instrumentation are necessary to perform combustion calibration:
•
Digital Combustion Analyzer: Oxygen accuracy to ± 0.2%; Carbon Monoxide (CO) and
Nitrogen Oxide (NOx) resolution to 1 PPM
•
0 to 16 inch W.C. (0 to 4.0 kPa) manometer or equivalent gauge and plastic tubing
•
1/4-inch NPT-to-barbed fittings for use with gas supply manometer
•
Small and large flat blade screwdrivers
•
Tube of silicone adhesive
5.2.2 Installing Gas Supply Manometer
A
16” W.C. (4.0 kPa) gas supply manometer (or gauge) is used in the following ways:
•
Mounted on the
upstream
side of the SSOV to verify that the gas supply pressure is
within the required range of 4” W.C. and 14” W.C.
•
Mounted on the
downstream
side of the SSOV to monitor the gas pressure during the
Combustion Calibration procedure, described in 5.3.
1. 1. Turn off the main gas supply upstream of the unit.
2. 2. Remove the top panel and/or front panel from the Water Heater to access the gas train.
3. 3.
Remove the 1/4” NPT plug from the leak detection ball valve on the upstream or
downstream side of the SSOV, as needed during testing, as shown in the Figure below.
4. 4. Install an NPT-to-barbed fitting into the tapped plug port.
5. 5. Attach one end of
the plastic tubing to the barbed fitting and the other end to the 16” W.C.
(4.0 kPa) manometer.
Figure 5-2: 1/4 Inch Gas Plug Location
LEAK DETECTION BALL
VALVE
LOW GAS PRESSURE
SWITCH
1/4” NPT PLUG
(Install manometer here
for
downstream
combustion calibration
reading)
NATURAL GAS INLET
SSOV
HIGH GAS
PRESSURE
SWITCH
1/4” NPT PLUG
(Install manometer here for
upstream
combustion
calibration reading)
TO AIR/FUEL VALVE