4 INSTALLATION
4.1 Assembly Sequence Overview
Typical SmartRow DCR assemblies with a single thermal-management unit are configured with the
Control Panel and Fire Suppression system and the thermal-management unit on the right-hand side. To
configure your assembly with the panel and unit on the left-hand side, start with
the SmartRow DCR for Left-to-Right Assembly
on the next page, then continue with the subsequent
instructions.
4.1.1 SmartRow DCR with Single Liebert PDX/PCW (20-kW (N) Configuration)
Refer to Figure 4.1 below components and follow the procedures in the subsequent sections to assemble
the SmartRow DCR.
Figure 4.1 Components of single Liebert PDX/PCW system installation
NO.
DESCRIPTION
NO.
DESCRIPTION
1
Emergency Ventilation Fans
5
Liebert PDX/PCW section (cooling unit behind control panel/fire-
suppression system.)
2
DCR Top Plenum-PDX/PCW
6
DCR network rack
3
DCR Control Panel
and Fire-suppression System
7
DCR server racks
4
DCR Base Plenum-PDX/PCW
8
DCR Top Plenum(s)-Rack
Vertiv
| SmartRow DCR Installer/User Guide |
15
Содержание SmartRow DCR
Страница 1: ...SmartRow DCR 3 to 6 Rack 20 kW N N 1 and 5 to 10 Rack 36 kW N Cooling Units 60 Hz Installer User Guide...
Страница 6: ...Vertiv SmartRow DCR Installer User Guide 6...
Страница 12: ...Vertiv SmartRow DCR Installer User Guide 12 This page intentionally left blank...
Страница 52: ...Vertiv SmartRow DCR Installer User Guide 52 This page intentionally left blank...
Страница 66: ...Vertiv SmartRow DCR Installer User Guide 66 This page intentionally left blank...
Страница 70: ...Vertiv SmartRow DCR Installer User Guide 70 This page intentionally left blank...
Страница 72: ...Vertiv SmartRow DCR Installer User Guide 72 This page intentionally left blank...
Страница 76: ...Vertiv SmartRow DCR Installer User Guide 76 This page intentionally left blank...
Страница 82: ...Vertiv SmartRow DCR Installer User Guide 82 This page intentionally left blank...
Страница 101: ......