background image

 

 

 

Event Master E2 

– Screen Management System 

Quick Start Guide

Input Cards

Output Cards

Expansion Cards

MVR

M2

P/N 26-1205004-00 Rev 01

Ethernet

Genlock

In

Loop

S

D

I

S

D

I

S

D

I

S

D

I

S

D

I

S

D

I

S

D

I

S

D

I

D

V

I

D

V

I

D

V

I

D

V

I

D

P

D

P

H

D

M

I

H

D

M

I

D

P

D

P

H

D

M

I

H

D

M

I

D

P

D

P

H

D

M

I

H

D

M

I

D

P

D

P

H

D

M

I

H

D

M

I

H

D

M

I

H

D

M

I

H

D

M

I

H

D

M

I

S

D

I

S

D

I

S

D

I

S

D

I

H

D

M

I

H

D

M

I

H

D

M

I

H

D

M

I

C

X

P

C

X

P

C

X

P

C

X

P

1

2

3

4

5

6

7

8

9

10

11

12

13

14

H

Dual Redundant Power Supplies

H

1

2

3

4

1

2

S3D

In

S3D

Out

Expansion Cards  

- 2 High speed CXP connectors

SDI Input & Output Cards 

- 4 SDI BNC connectors
- SD/HD/3G formats (6G ready)

DisplayPort/HDMI  Combo Input Cards 

- 2 DP and 2 HDMI locking connectors
- Displayport 1.1a specification
- HDMI 1.4a specification
- HDCP 1.4 & EDID 1.3

DVI Input Cards

- 2 DVI-I connectors (no analog signals) 
- Single / Dual Link formats
- DVI 1.0 specification
- HDCP 1.4  &  EDID 1.3

Quad Channel DisplayPort Output Cards 

- 4 full-size DP locking connectors
- Up to 4 independent signals
- DisplayPort 1.2 specification
- HDCP will be supported in a future software 
  release.

HDMI Output cards (including MVR)

- 4 HDMI connectors (top 2 connectors capable of 

high-speed HDMI signals up to 300 MHz)

- HDMI 1.4a specification
- HDCP 1.4 and EDID 1.3

M1

Be sure that you properly align the Link cable connectors prior to insertion. 
Connectors should insert easily with almost no resistance, until the lock is 
about to engage. Be sure that the lock engages fully to ensure proper 
contact. Make sure that you use the locking mechanism and then push 
each cable until it locks in place.

1. Connect the Link cables provided with each E2 between the Link 
    connectors as follows:

• VP ID 0, Link Card slot 1, Link 1 >> VP ID 1, Link Card slot 1, Link 2
• VP ID 0, Link Card slot 1, Link 2 >> VP ID 1, Link Card slot 1, Link 1
• VP ID 0, Link Card slot 2, Link 1 >> VP ID 1, Link Card slot 2, Link 2
• VP ID 0, Link Card slot 2, Link 2 >> VP ID 1, Link Card slot 2, Link 1

4. Start the Event Master Toolset 

version 4.0 or higher.

5. Make sure that both E2s are 

discovered on the network and that 
they have different Unit IDs.

If the system does not discover your 
device, you may manually add it. See 
"How to manually add a device into 
the selected system" 

in the user’s 

guide.

6. Drop one of the E2s in the EM GUI.

Link Connections

Ethernet switch

PC with Event Master 

Control Software 

MVR

MVR

Refer to the 

Event Master devices User’s 

guide 

(R5905948) for detailed system 

specifications, descriptions and operation 
instructions.

Any item contained in this document may 

change without notice.

For the latest version of the 

Event Master 

devices User’s guide

 (R5905948) and the 

E2 

– 

Screen Management System Quick Start 
Guide

 (26-1205004-00), visit www.barco.com.

Power Switch

USB Port

SEL and ESC Buttons

ADJUST Knob

Display

System Setup

1. Ensure that the unit is physically secured in a 

rack or is placed on a flat surface with stable 
support. If the unit is installed in a rack, 

it is 

mandatory that the rear brackets are also 
installed

.

2. Connect all sources, displays, and peripherals 

to the E2 

according to your event’s 

requirements.

3. Connect AC power to the unit. If power 

redundancy is desired, connect power to both 
power plugs.

4. Connect to a computer that has the Event 

Master control software installed, via an 
Ethernet cable. A switch is optional if additional 
devices will be connected.

5. Power up the E2, the PC, all monitors and 

peripherals.

6. Verify that no error messages appear on the E2 

front panel. 

7. After the E2 boots up, run the Event Master 

control software and follow the sequence of 
instructions listed in this Quick Start Guide to 
complete the system setup and configuration.

Should the system not fully boot correctly, press 
and hold the SEL and ESC buttons while 
applying power to the unit. Release these 
buttons when a menu appears asking to Factory 
Reset the unit. Perform the Factory Reset and 
the unit will boot normally.

 Dashboard

 a quick glance of your E2

Expansion

0

Ready

√ Run Diagnostics 

Expansion

1

Ready

√ Run Diagnostics 

Input

2

Ready

√ Run Diagnostics 

Input

3

Ready

√ Run Diagnostics 

Input

4

Ready

√ Run Diagnostics 

Input

5

Ready

√ Run Diagnostics

 

Input

6

Ready

√ Run Diagnostics 

Input

7

Ready

√ Run Diagnostics 

Input

8

Ready

√ Run Diagnostics 

Input

9

Ready

√ Run Diagnostics 

Input

10

Ready

√ Run Diagnostics 

Expansion

Slot ID

Card Status

Actions

Inputs

Outputs

Other

S1

S2

S3

SETTINGS MENU

S1:

 Options -  On the Options tab 

click on the boxes to select system 
wide user preferences such as 
Layer positioning.

S2:

 Tools - Allows users to 

perform Backup and Restore 
operations or download the latest 
software from the Barco website

S3:

 Dashboard - Provides status 

information regarding  the cards 
and other system diagnostic 
information.

inputs, and they expand the number of layers and outputs. For more information on linking, see Section 6.17 "Configuration Menu > Linking in the Event 
Master Devices User's Guide, or see the instructional videos on the Barco Folsom IP YouTube site.

For links to other quick-start guides and the Event Master Devices User's Guide, see the Technical Downloads tab for each product on the Barco 
Presentation switchers page at: 

https://www.barco.com/en/Products/Image-processing/Presentation-switchers

Linking

An Event Master unit can link with other 
Event Master units. Depending on the 
linking configuration, linked units share 

Barco Technical Support: 
USA

:  +1 (866) 374-7878

EMEA : 

 0800 90 0410

CHINA :

 40088 22726

APAC:

 +603-78803362

www.barco.com/en/Support

For links to instructional videos, see the Barco Folsom IP YouTube site at: 

https://www.youtube.com/user/BarcoFolsomIP.

Notes:

- Input and Output cards each support 
  one 4K/UHD signal.

- This sample system shows the optional DP 1.2 
  Output card. The system does not ship with this 
  card; your configuration may be different.

Cards are 

not

 hot-swappable.

Example: Linking a pair of E2s

1. Check the cable orientation for keying. The cable fits in only one orientation.

2. Fully insert the cable into the connector on the Link Card.

3. If the cable resists full insertion, do not force it; pull the cable out, check its 

orientation, and reinsert it.

4. Make sure that the latch is properly engaged.

5. Always use the release when removing the cable.

Improper insertion or removal of Link cables can damage the 
connectors and is not covered under the product warranty.

2. Make sure that the E2s have different IP addresses.

The default IP address for each unit is the same; one of them must be 
changed.

3. Connect all devices to network Ethernet.

7. Drop the second E2 in the EM GUI.

The EM GUI presents the options of adding the second unit as a new system, 
as a master, or a as a slave.

H

D

M

I

H

D

M

I

H

D

M

I

H

D

M

I

H

 

 

MULTIVIEWER (MVR) 

MENU

M1:

 Select MVR Sources -  From 

the dropdown menus select the 
Inputs, Backgrounds, and 
Destinations you want to view 
and drop them into Multiviewer 
Outputs. Overlapping is not 
allowed. An MVR source may be 
used twice. A maximum total of 
63 windows can be used for 
Inputs and 63 windows can be 
used for Outputs. 

M2:

 Adjust Window - Adjust the 

size, position and the color 
parameters associated with each 
window. Repeat for all Inputs and 
save.

Отзывы: