8 INSTALLATION CHECKLIST
8.1 Cooling and Power Component Installation Checklist
1. All cabinets and plenums have been installed.
2. All gaskets and edge guards are installed.
3. All electrical and piping connections have been made.
4. All cabinet doors seal and close securely.
5. All Emergency Power Off interlocks to the UPSs and to the Liebert PDX/PCW (P2 4-pin
Connector) are connected.
6. All external Emergency Power Off and fire detection connections have been made, if
applicable.
7. All Rack PDUs are installed and connected to the load-distribution center for external UPS
configurations and to UPS outputs for internal UPS configurations, if applicable.
8. Fire-suppression control panel (CB-4) and the SmartRow DCR control logic circuit (CB-2)
connected to a centralized or rack-mounted, online, double-conversion UPS.
9. Liebert PDX/PCW has been started-up and factory-commissioned.
10. UPSs have been installed and are operational.
11. If applicable:
a. Are all power-supply systems that are required to be shut-down by the EPO button
properly tied-in to the shutdown terminals?
b. Are the Liebert PDX/PCW units connected to the SmartRow DCR Thermal Unit
Shutdown circuit? (P2 and, if applicable, P2R)
c. Is there 120-V power supplied to your shunt-trip assembly (if applicable)?
d. When the local EPO button is pushed:
1. Does the power supply for the DCR (Load Distribution Center or UPS systems)
Shutdown?
2. Does the Liebert PDX/PCW unit(s) shutdown?
12. Bypass timer for emergency power override works. To test the timer:
a. Turn the EPO bypass timer of an operational SmartRow DCR system past the 1-hour
position.
b. Push the EPO button and check to see if your components that are tied-in to the circuit
are still operational
c. Once confirmed, disengage the EPO button.
13. All external cable and piping entrances are properly sealed.
14. All rack supply air dampers have been adjusted to distribute the air based on the heat load in
each cabinet.
15. 2T temperature sensor nodes are installed in the DCR racks, and are routed correctly in each
rack
16. Supply Air Temperature Sensor is installed in the DCR Base Plenum-Rack.
17. The Liebert iCOM displays the system supply-air temperature.
18. All monitoring points are communicating to the Network Management System.
Vertiv
| SmartRow DCR Installer/User Guide |
67
Содержание SmartRow DCR
Страница 1: ...SmartRow DCR 3 to 6 Rack 20 kW N N 1 and 5 to 10 Rack 36 kW N Cooling Units 60 Hz Installer User Guide...
Страница 6: ...Vertiv SmartRow DCR Installer User Guide 6...
Страница 12: ...Vertiv SmartRow DCR Installer User Guide 12 This page intentionally left blank...
Страница 52: ...Vertiv SmartRow DCR Installer User Guide 52 This page intentionally left blank...
Страница 66: ...Vertiv SmartRow DCR Installer User Guide 66 This page intentionally left blank...
Страница 70: ...Vertiv SmartRow DCR Installer User Guide 70 This page intentionally left blank...
Страница 72: ...Vertiv SmartRow DCR Installer User Guide 72 This page intentionally left blank...
Страница 76: ...Vertiv SmartRow DCR Installer User Guide 76 This page intentionally left blank...
Страница 82: ...Vertiv SmartRow DCR Installer User Guide 82 This page intentionally left blank...
Страница 101: ......