39
107672-01- 7/17
Option #
37
38
39
Illustrated in Figure
7.23, 7.24
7.23, 7.24
7.25a
Pipe Penetration
Through Structure
Vent
Roof
Roof
Roof
Intake
Wall
Wall
Wall
Material
Vent
Centrotherm
InnoFlue (Rigid/Flex)
Centrotherm
InnoFlue (Rigid/
Flex)
DuraVent FasNSeal
Flex
Intake
PVC
PVC
PVC
Nominal Diameter
Vent
2”
3”
3”
Intake
2” or 3”
3”
3”
Min Equivalent Vent Length:
Models
080
48”
48”
48”
100
48”
48”
48”
120
Not Permitted
48”
48”
150
52”
52”
180
52”
52”
Max Equivalent Vent Length (Note 1):
Models
080
60ft
135ft
135ft
100
60ft
135ft
135ft
120
Not Permitted
135ft
135ft
150
135ft
135ft
180
135ft
135ft
Rigid Vent Terminals
Vent
Not Permitted
Intake
Flex Termination
& Components
(Masonry Chimney
Chase) (Note 3)
Vent
IFCK02**
IFCK03**
3FSFLEX-**
FSFLEXRC3
Intake
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
Flex Termination &
Components (B-Vent
Chimney Chase)
Vent
IFBK02****
IFBK03****
Not Permitted
Intake
90 Elbow
w/Screen
90 Elbow
w/Screen
* Specify size of B vent (e.g. 2PPS-BV6 is for use with 6” B vent).
** Specify length in feet.
**** Specify Flex length and B vent diameter (e.g. IFBK022505 includes 25ft of flex and used with 5”
B vent).
Note 1: Max vent lengths shown also apply to the intake. Flex vent reduces the maximum allowable
vent length in some applications. See equivalent lengths for flex vent shown in Table 7.14 and sizing
example on page 35.
Note 2: First 30” plus first exhaust elbow are CPVC.
Note 3: See vent manufacturer’s installation manual for gaskets, spacers and other required vent
components.
All vertical terminals require compatible roof flashing and storm collars.
VII. Venting
D. Design Requirements Unique to Split Vent Systems (continued)
Table 7.21: Summary of Split Vent System Options (cont.)
Содержание K2WT-080B
Страница 11: ...11 107672 01 7 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued...
Страница 79: ...79 107672 01 7 17 Figure 9 6 Piping Method 1 Near Boiler Piping Shaded Boiler Loop IX System Piping continued...
Страница 83: ...83 107672 01 7 17 PAGE LEFT INTENTIONALLY BLANK...
Страница 89: ...89 107672 01 7 17 X Wiring continued Figure 10 5 Internal Ladder Diagram...
Страница 90: ...90 107672 01 7 17 X Wiring continued...
Страница 91: ...91 107672 01 7 17 Figure 10 6 Internal Wiring Connections Diagram X Wiring continued...
Страница 93: ...93 107672 01 7 17 Figure 10 8 TACO SR504 or Equivalent Zone Panel Wiring Connection Diagram X Wiring continued...
Страница 94: ...94 107672 01 7 17 X Wiring continued Figure 10 9 Sage Zone Control Circulator Panel Wiring Connection Diagram...
Страница 102: ...102 107672 01 7 17 Lighting and Operating Instructions XI Start Up and Checkout continued...
Страница 147: ...147 107672 01 7 17 XV Service Parts continued...
Страница 151: ...151 107672 01 7 17 XV Service Parts continued...
Страница 153: ...153 107672 01 7 17 XV Service Parts continued 85 86 91 95...
Страница 162: ...162 107672 01 7 17...
Страница 163: ...163 107672 01 7 17...
Страница 164: ...164 107672 01 7 17...
Страница 165: ...165 107672 01 7 17...
Страница 166: ...166 107672 01 7 17...
Страница 167: ...167 107672 01 7 17...
Страница 168: ...168 107672 01 7 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...