51
107672-01- 7/17
Figure 7.35: PolyPro Locking Band Installation
VII. Venting
F. Assembly of DuraVent PolyPro Vent Systems (continued)
F. Assembly of DuraVent PolyPro Vent Systems
1. This boiler has been listed for use with the DuraVent PolyPro single wall Polypropylene vent system to be provided by the
installer.
Warning
Asphyxiation Hazard. Follow these instructions and the installation instructions included by the
original Polypropylene venting component manufacturers, M&G/DuraVent. Failure to do so could
cause products of combustion to enter the building, resulting in severe property damage, personal
injury or death. Where a conflict arises between M&G/DuraVent instructions and these instructions,
the more restrictive instructions shall govern.
Do not mix vent components or joining methods for listed manufacturers.
Examine all components for possible shipping damage prior to installation.
All condensate that forms in the vent must be able to drain back to the boiler.
2. Assemble the vent system, starting at the boiler:
a. The vent adaptor has three different inside diameters. The middle inside diameter accepts 3” nominal PolyPro (Figure
7.27). A locking band clamp in the adaptor prevents the vent pipe from coming out of the adaptor once it is installed
and tightened. Lubricate the gaskets in the vent adaptor with soapy water and insert the first piece of 3” PolyPro into the
adaptor until it bottoms out. Tighten locking band clamp to secure vent pipe.
b. If 2” PolyPro is to be used for the vent system, reduce the first piece of 3” PolyPro installed in Step (a) to 2” using
DuraVent # 3PPS-R2. Otherwise assemble the next piece of 3” PolyPro.
c. For each joint, verify that the gasket is evenly seated in the bell (female) end of the pipe. Lubricate this gasket with water.
Slide a locking band over the male end of the pipe to be joined as shown in Figure 7.35. Push the male end of the next
section of pipe into the bell until it bottoms out, then back out 1/4-5/8” to provide room for thermal expansion. Push barb
on locking band over the bell end of the first section of pipe as shown in Figure 7.35.
d. Assemble the rest of the vent system per the manufacturer’s installation instructions, being sure to pitch horizontal
sections back towards the boiler 5/8” per ft.
e. Support each horizontal pipe section with a minimum of one wall strap each and at intervals not exceeding 4ft.
Содержание K2WT-080B
Страница 11: ...11 107672 01 7 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued...
Страница 79: ...79 107672 01 7 17 Figure 9 6 Piping Method 1 Near Boiler Piping Shaded Boiler Loop IX System Piping continued...
Страница 83: ...83 107672 01 7 17 PAGE LEFT INTENTIONALLY BLANK...
Страница 89: ...89 107672 01 7 17 X Wiring continued Figure 10 5 Internal Ladder Diagram...
Страница 90: ...90 107672 01 7 17 X Wiring continued...
Страница 91: ...91 107672 01 7 17 Figure 10 6 Internal Wiring Connections Diagram X Wiring continued...
Страница 93: ...93 107672 01 7 17 Figure 10 8 TACO SR504 or Equivalent Zone Panel Wiring Connection Diagram X Wiring continued...
Страница 94: ...94 107672 01 7 17 X Wiring continued Figure 10 9 Sage Zone Control Circulator Panel Wiring Connection Diagram...
Страница 102: ...102 107672 01 7 17 Lighting and Operating Instructions XI Start Up and Checkout continued...
Страница 147: ...147 107672 01 7 17 XV Service Parts continued...
Страница 151: ...151 107672 01 7 17 XV Service Parts continued...
Страница 153: ...153 107672 01 7 17 XV Service Parts continued 85 86 91 95...
Страница 162: ...162 107672 01 7 17...
Страница 163: ...163 107672 01 7 17...
Страница 164: ...164 107672 01 7 17...
Страница 165: ...165 107672 01 7 17...
Страница 166: ...166 107672 01 7 17...
Страница 167: ...167 107672 01 7 17...
Страница 168: ...168 107672 01 7 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...