44
107672-01 - 7/17
VII. Venting
E. Assembly of CPVC/PVC Vent Systems (continued)
Warning
Asphyxiation Hazard. Failure to follow these instructions could cause products of combustion to
enter the building, resulting in severe property damage, personal injury or death.
Use all CPVC vent components for near-boiler vent piping before transitioning to Schedule 40 PVC
pipe (ASTM 2665) components for remainder of vent system.
Use CPVC vent components within any interior space where air cannot circulate freely, including
through vertical or horizontal chase ways, inside a stud wall, in closets and through wall penetrations.
The use of cellular core PVC (ASTM F891), cellular core CPVC or Radel (polyphenolsulfone is
prohibited).
All condensate that forms in the vent must be able to drain back to the boiler.
Never leave the boiler in operation without the gas sample cap in place (Figure 7.27).
E. Assembly of CPVC/PVC Vent Systems
1. Assemble the vent system, starting at the boiler:
a. If 3” PVC is to be used for venting, a 3” CPVC elbow and the 30” straight section of CPVC must be used before
transitioning to PVC. If necessary the 30” straight section of CPVC may be cut at any location and a CPVC elbow can be
inserted between the two resulting segments.
b. When cutting CPVC or PVC pipe, use a miter saw or a saw designed to cut PVC pipe. Use a miter box or other method to
cut pipe squarely. De-burr both the inside and outside of the cut end.
c. Dry fit all vent components before assembly.
d. The vent adaptor has three different inside diameters. The larger (upper) inside diameter accepts 3” CPVC pipe and is
used in this application (the middle inside diameter accepts 3” nominal PolyPro, Polyflue or InnoFlue, and the smaller,
lower inside diameter accepts 3” stainless steel). A locking band clamp in the adaptor prevents the vent pipe from coming
out of the adaptor once it is installed and tightened. Lubricate the gaskets in the vent adaptor with water and insert the first
piece of 3” CPVC into the vent adaptor until it bottoms out. Tighten locking band clamp to secure vent pipe.
e. If 2” CPVC is to be used for the vent system, reduce the first piece of 3” CPVC installed in Step (b) to 2” CPVC using
a CPVC reducing coupling or elbow. Otherwise assemble a 3” CPVC elbow and remainder of 30” CPVC piping before
transitioning to PVC. If 3” PVC is used, the first piece of PVC will either be connected to the CPVC elbow or the end of
a section of CPVC vent pipe. In the latter case, a PVC coupling may be used to connect the first piece of PVC to the last
piece of CPVC.
f. Clean all CPVC and PVC components with the appropriate primer before cementing. Cement the vent system together,
starting at the boiler and following the instructions provided on the cans of cement and primer. Use a field supplied
cement and primer that is listed for use with the materials being joined (CPVC and/or PVC). The following, or its
equivalent, may be used to join CPVC to PVC:
•
IPS Corporation #P-70 Primer
•
IPS Corporation #790 Multi-Purpose Solvent Cement
Always use primer on both the pipe and fitting before applying the cement. Assemble the pipe in accordance with the
instructions on the cans of primer and cement.
Содержание K2WT-080B
Страница 11: ...11 107672 01 7 17 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued...
Страница 79: ...79 107672 01 7 17 Figure 9 6 Piping Method 1 Near Boiler Piping Shaded Boiler Loop IX System Piping continued...
Страница 83: ...83 107672 01 7 17 PAGE LEFT INTENTIONALLY BLANK...
Страница 89: ...89 107672 01 7 17 X Wiring continued Figure 10 5 Internal Ladder Diagram...
Страница 90: ...90 107672 01 7 17 X Wiring continued...
Страница 91: ...91 107672 01 7 17 Figure 10 6 Internal Wiring Connections Diagram X Wiring continued...
Страница 93: ...93 107672 01 7 17 Figure 10 8 TACO SR504 or Equivalent Zone Panel Wiring Connection Diagram X Wiring continued...
Страница 94: ...94 107672 01 7 17 X Wiring continued Figure 10 9 Sage Zone Control Circulator Panel Wiring Connection Diagram...
Страница 102: ...102 107672 01 7 17 Lighting and Operating Instructions XI Start Up and Checkout continued...
Страница 147: ...147 107672 01 7 17 XV Service Parts continued...
Страница 151: ...151 107672 01 7 17 XV Service Parts continued...
Страница 153: ...153 107672 01 7 17 XV Service Parts continued 85 86 91 95...
Страница 162: ...162 107672 01 7 17...
Страница 163: ...163 107672 01 7 17...
Страница 164: ...164 107672 01 7 17...
Страница 165: ...165 107672 01 7 17...
Страница 166: ...166 107672 01 7 17...
Страница 167: ...167 107672 01 7 17...
Страница 168: ...168 107672 01 7 17 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...