3NB/3ND/3N0/3NK-2
1-4-26
BR conveying sensor
1/2 unreachable/stay
jam (J49XX)
Eject sensor non
arrival jam (J50XX)
Eject sensor stay jam
(J51XX)
DF paper entry error
JAM (J600X)
9. Check if the pivot of the
paper conveying guide
of the bridge eject unit
has fallen off.
Re-mount.
10. Check if the ribs of the
conveying unit of the
bridge eject unit have
fallen off.
If a rig is broken, replace the coveying guide.
DF conveying sensor
unreachable jam
(J610X)
DF conveying sensor
retention jam (J611X)
1. Check it the main unit
and the DF are
vertically flush with
each other.
Perform the height adjustment by referring to the
installation instructions.
2. Check if the upper
conveying guide on the
Bridge conveying unit
has fallen off.(Fixing an
anti-falling part)
Caution:
Only MFP-A
Re-mount. (Fixing an anti-falling part)
Jam types
Check description
Corrective measures
Note that when the top cover of the eject unit becomes open,
the axle falls off because the internal paper conveyance
guide falls off.
Paper conveyance guide
Caution
Caution
Confirm that the paper conveyance
guide has not fallen off nor the
axle is not off.
The part that is marked with a
circle in the figure to the left.
Conveyance Unit
Upper cover
Affix fixing films (No. 1) at the two axles.
A view of the AK (Bridge) Conveyance Unit
Tray being opened
Upper guide
Lower guide
Films (No. 1)
Adhesive tape
Содержание UTAX AK 730
Страница 5: ...This page is intentionally left blank ...
Страница 11: ...This page is intentionally left blank ...
Страница 15: ...3NB 3ND 3N0 3NK This page is intentionally left blank ...
Страница 25: ...3NB 3ND 3N0 3NK 1 1 10 This page is intentionally left blank ...
Страница 43: ...3NB 3ND 3N0 3NK 1 2 18 3 Remove tape and pad Figure 1 2 23 Tape Pad ...
Страница 45: ...3NB 3ND 3N0 3NK 1 2 20 This page is intentionally left blank ...
Страница 81: ...3NB 3ND 3N0 3NK 1 3 36 This page is intentionally left blank ...
Страница 157: ...3NB 3ND 3N0 3NK 1 4 76 This page is intentionally left blank ...
Страница 169: ...3NB 3ND 3N0 3NK 1 5 12 This page is intentionally left blank ...
Страница 206: ...3NB 3ND 3N0 3NK 2 2 11 This page is intentionally left blank ...
Страница 246: ...1 1 INSTALLATION GUIDE INSTALLATION GUIDE FOR 4000 SHEETS FINISHER ...
Страница 269: ...INSTALLATION GUIDE FOR FINISHER ATTACHMENT KIT MFP A ...
Страница 283: ...INSTALLATION GUIDE FOR FINISHER ATTACHMENT KIT MFP B ...
Страница 284: ...E F A H G I J B D C ...
Страница 291: ...INSTALLATION GUIDE FOR FINISHER ATTACHMENT KIT PRINTER ...
Страница 295: ...INSTALLATION GUIDE FOR CENTER FOLDING UNIT ...
Страница 312: ...INSTALLATION GUIDE FOR MULTI TRAY ...
Страница 326: ...INSTALLATION GUIDE FOR MULTI TRAY ATTACHMENT KIT PRINTER ...
Страница 330: ...INSTALLATION GUIDE FOR PUNCH UNIT ...