1‑12
1.4.5. Unit Layout of the First Floor
This drawing shows unit location fixed to lower chassis.
Fig. 1-13 Unit layout of the first floor
1. Power transformer
Input voltage (AC100V, 115V or 230V.)
Output
voltage
(AC100V)
2. DP-2
Pump for reaction waste liquid and washing
trough waste water.
3. DP-1
Pump to aspirate reaction cuvette washing
solution and to degas from degasser.
4. Degasser
Module to remove air in washing water.
5. Washing solution pre-heater
Heater for reaction cuvette and probe
washing solution and for alkaline and acidic
washing
solution.
6. Electromagnetic valve EV-3
Valve for switching piping lines of R1 and
R2
probes.
7. Electromagnetic valve EV-5
Valve for switching aspiration lines of dry
tips and degasser.
8. Electromagnetic valve EV-6
Valve for switching aspiration lines of WSH
and washing trough.
1
2
3
4
5
6
7
8
Содержание Labmax 240
Страница 1: ...Automated Clinical Analyzer Service Manual Version 1 44 TOKYO BOEKI LTD...
Страница 12: ......
Страница 18: ......
Страница 40: ...2 8 2 4 Reagent Dispensation Process Fig 2 4 Reagent Dispensation Process 1 2...
Страница 41: ...Service Manual Chapter 2 2 9 Fig 2 5 Reagent Dispensation Process 2 2...
Страница 43: ...Service Manual Chapter 2 2 11 2 5 Sample Dispensation Process Fig 2 6 Sample Dispensation Process 1 2...
Страница 44: ...2 12 Fig 2 7 Sample Dispensation Process 2 2...
Страница 46: ......
Страница 110: ......
Страница 140: ......