7
•
Maintenance and Service
Page 150
Vanquish Pumps (VH-P10-A-02) Operating Manual
13. Place the seal wash plate onto the pump head and insert the screws.
Figure 52: Pump head with seal wash plate and plate screws
14. With the screwdriver, hand-tighten the screws step by step in the
order shown in the picture.
Figure 53: Tightening order for seal wash plate screws
15. Tighten the screws step by step in the given order once again.
16. Install the pistons. Follow the related steps in
section 7.7.3,
page 142
17. Install the pump head. Follow the related steps in
section 7.7.2,
page 138
18. Observe the recommendations for new piston seals (see
19. Inspect all flow connections on the pump head for indications of
leakage. Tighten leaky connections when the system pressure is
down to zero.
20. In Chromeleon, consider updating the Predictive Performance
information for the piston seals.
21.
Optional
Test the seal wash system and the pump for leakage.
Содержание Vanquish VH-P10-A-02
Страница 1: ...Vanquish Pumps VH P10 A 02 Operating Manual 4820 4411 EN Revision 1 0 October 2017 thermoscientific ...
Страница 4: ...Contacting Us Page 4 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 10: ...Contents Page 10 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 30: ...2 Safety Page 30 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 46: ...4 Unpacking Page 46 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 80: ...5 Installation Page 80 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 232: ...11 Appendix Page 232 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 233: ...12 Index Vanquish Pumps VH P10 A 02 Operating Manual Page 233 12 Index ...
Страница 238: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com ...