7
•
Maintenance and Service
Page 134
Vanquish Pumps (VH-P10-A-02) Operating Manual
7.6
Y-Connector
When
Damage of Y-connector
Parts required
Y-connector
Tools and additional items required
•
Solvent suitable for purging to flush out harmful substances
•
Solvent suitable for your application
Preparations
1. To flush out harmful substances, purge the pump with an
appropriate solvent.
2. Turn off the pump flow and wait until the system pressure is down
to zero.
Follow these steps
Figure 40: Y-Connector, used as left Y-connector (A) or right Y-connector
(B)
No.
Description
1
Capillaries to outlet check valves on pump head
2
Capillary to purge unit (port marked
R
or
L
, depending on Y-connector
position)
1. Disconnect the Y-connector capillaries on the purge unit and on the
outlet check valves of the pump head.
Содержание Vanquish VH-P10-A-02
Страница 1: ...Vanquish Pumps VH P10 A 02 Operating Manual 4820 4411 EN Revision 1 0 October 2017 thermoscientific ...
Страница 4: ...Contacting Us Page 4 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 10: ...Contents Page 10 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 30: ...2 Safety Page 30 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 46: ...4 Unpacking Page 46 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 80: ...5 Installation Page 80 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 232: ...11 Appendix Page 232 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 233: ...12 Index Vanquish Pumps VH P10 A 02 Operating Manual Page 233 12 Index ...
Страница 238: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com ...