7
•
Maintenance and Service
Vanquish Pumps (VH-P10-A-02) Operating Manual
Page 135
2. Install the new Y-connector:
First, connect the Y-connector capillaries to the outlet check valves.
Then, connect the capillary to the purge unit.
3. Purge the pump using the solvent for your application.
4. Inspect the flow connections of the Y-connector for indications of
leakage. Tighten leaky connections when the system pressure is
down to zero.
Содержание Vanquish VH-P10-A-02
Страница 1: ...Vanquish Pumps VH P10 A 02 Operating Manual 4820 4411 EN Revision 1 0 October 2017 thermoscientific ...
Страница 4: ...Contacting Us Page 4 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 10: ...Contents Page 10 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 30: ...2 Safety Page 30 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 46: ...4 Unpacking Page 46 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 80: ...5 Installation Page 80 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 232: ...11 Appendix Page 232 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 233: ...12 Index Vanquish Pumps VH P10 A 02 Operating Manual Page 233 12 Index ...
Страница 238: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com ...