7
•
Maintenance and Service
Page 172
Vanquish Pumps (VH-P10-A-02) Operating Manual
7. Insert the new static mixer into the mounting bracket. Mind the
direction of flow through the static mixer (indicated by the arrow on
the static mixer).
8. As applicable, reconnect the capillary mixer to the static mixer inlet
or install a new capillary mixer.
When installing a new capillary mixer, mind the direction of flow
through the capillary mixer (indicated by the arrow on the capillary
mixer).
9. On the static mixer outlet, reconnect the capillary to the
autosampler injection valve.
10. Reinstall the right Y-connector.
11. Reconnect the cable of seal wash detector to the
DROP DET
port.
12. Reconnect the pump head cable to
P-WORK
port if applicable.
13. Apply the flow rate of your application and have the pump deliver
for a short time.
14. Inspect the flow connections on the mixer for indications of leakage
before resuming operation.
15. In Chromeleon, consider updating the Predictive Performance
information for the static mixer (
InlineFilterChanged
command).
16.
Optional
Test the pump for leakage.
Содержание Vanquish VH-P10-A-02
Страница 1: ...Vanquish Pumps VH P10 A 02 Operating Manual 4820 4411 EN Revision 1 0 October 2017 thermoscientific ...
Страница 4: ...Contacting Us Page 4 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 10: ...Contents Page 10 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 30: ...2 Safety Page 30 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 46: ...4 Unpacking Page 46 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 80: ...5 Installation Page 80 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 232: ...11 Appendix Page 232 Vanquish Pumps VH P10 A 02 Operating Manual ...
Страница 233: ...12 Index Vanquish Pumps VH P10 A 02 Operating Manual Page 233 12 Index ...
Страница 238: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com ...