![TERSUS AG960 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/tersus/ag960/ag960_user-manual_1090360022.webp)
21
/
167
5.
Phillips screwdriver (large)
1 pcs.
6.
Phillips screwdriver (small)
1 pcs.
7.
Straight screwdriver (large)
1 pcs.
8.
Straight screwdriver (small)
1 pcs.
9.
Diagonal pliers
1 pcs.
10.
Pincer pliers
1 pcs.
11.
Sharp-nose pliers
1 pcs.
12.
Measuring tape
1 pcs.
13.
Pistol drill
1 set
14.
Cutting machine
1 set
4.1
Installation of Electronic Components
To install electronic components, the agricultural machines should be placed on a
level plane, for example, flat cement surface or road surface. If it stops on an inclined
ground, error may occur in terms of the installation position and orientation
measurement of products on the vehicles and thus affect the autopilot performance.
The process of installing electronic components of AG960 can be divided into the
following 4 steps.
1)
Install satellite navigation antenna (including antenna pedestal, RF cable)
2)
Install radio receiving antenna (including antenna pedestal, RF cable)
3)
Install panel computer (including its bracket)
4)
Install Autopilot (Controller) (including its adapter plate)
4.1.1
Installation of Satellite Navigation Antenna
AG960 contains two satellite navigation antennas installed to the left and right side at
the top of the driving cab of the agriculture machine respectively, where the right
antenna is the primary antenna responsible for acquiring vehicle position information
and the left one is the secondary antenna responsible for acquiring vehicle orientation
information.
The satellite navigation antenna is installed onto the vehicle according to the
following procedures.