TA I
NSTRUMENTS
TMA 2940
4–15
3. Lay the clamp and sample into the sample
block so that the clamp fits into the notch on
one end.
4. Lift up the free end of the film and slide the
other clamp onto the end, positioning the
clamp relief notch opening at the bottom of
the sample (see Figure 4.5).
5. Move the clamp into the desired notch
position (for either a 9, 13, or 25-mm
sample).
6. Tighten the screws so that the sample is flat
in the block and is positioned perpendicular
to the clamps (see Figure 4.6).
Figure 4.6
Film Sample
Preparation
7. Remove the clamps and sample from the
block and trim off the excess material.
8. Place one clamp on edge over the slot in the
film/fiber stage so that the film hangs down
into the slot.
Film/Fiber Accessory
Содержание TMA 2940
Страница 18: ...TA INSTRUMENTS TMA 2940 XVIII...
Страница 20: ...Introduction 1 2 TA INSTRUMENTS TMA 2940...
Страница 34: ...Introduction 1 16 TA INSTRUMENTS TMA 2940...
Страница 36: ...Installation TA INSTRUMENTS TMA 2940 2 2...
Страница 62: ...Installation TA INSTRUMENTS TMA 2940 2 28 Figure 2 17 Isolation Transformer Cable Connections...
Страница 66: ...Installation TA INSTRUMENTS TMA 2940 2 32...
Страница 138: ...Using Your Options TA INSTRUMENTS TMA 2940 4 48...
Страница 140: ...5 2 TA INSTRUMENTS TMA 2940 Technical Reference...
Страница 150: ...5 12 TA INSTRUMENTS TMA 2940 Technical Reference...
Страница 152: ...Maintenance and Diagnostics TA INSTRUMENTS TMA 2940 6 2...
Страница 168: ...Maintenance and Diagnostics TA INSTRUMENTS TMA 2940 6 18...