Table of Contents 9- i
9
Section 9
CONTENTS
Body and Accessories
Precautions .................................................9-1
Precautions............................................................. 9-1
Precautions for Electrical System ......................... 9-1
Component Location ............................................. 9-1
Electrical Components Location ........................... 9-1
Wiring Systems........................................ 9A-1
Schematic and Routing Diagram........................9A-1
Wiring Diagram ................................................... 9A-1
Wiring Harness Routing Diagram........................ 9A-4
Specifications.......................................................9A-7
Service Data ....................................................... 9A-7
Tightening Torque Specifications........................ 9A-7
Lighting Systems..................................... 9B-1
Repair Instructions ..............................................9B-1
Headlight Components ....................................... 9B-1
Headlight Removal and Installation .................... 9B-1
Headlight Bulb Replacement .............................. 9B-2
Headlight Beam Adjustment ............................... 9B-2
Rear Combination Light components.................. 9B-2
Rear Combination Light Removal and
Installation ......................................................... 9B-3
Rear Combination Light Bulb Replacement ........ 9B-3
Reversing Light Bulb Replacement (For P-17) .... 9B-4
Reversing Light Relay Inspection (For P-17) ...... 9B-4
Dimmer Switch Inspection................................... 9B-4
Specifications.......................................................9B-5
Service Data ....................................................... 9B-5
Special Tools and Equipment .............................9B-5
Special Tool ........................................................ 9B-5
Combination Meter / Fuel Meter / Horn.. 9C-1
General Description .............................................9C-1
Combination Meter System Description..............9C-1
Repair Instructions ..............................................9C-2
Combination Meter Components ........................9C-2
Combination Meter Removal and Installation .....9C-2
Combination Meter Disassembly and
Assembly ..........................................................9C-3
Combination Meter Inspection ............................9C-3
Engine Coolant Temperature Indicator Light
Inspection..........................................................9C-3
Engine Coolant Temperature Removal and
Installation .........................................................9C-4
Fuel Level Indicator Inspection ...........................9C-4
Fuel Level Gauge Inspection ..............................9C-5
Speedometer Inspection .....................................9C-6
Speed Sensor Removal and Installation .............9C-6
Speed Sensor Inspection ....................................9C-6
Ignition Switch Inspection....................................9C-7
Ignition Switch Removal and Installation.............9C-7
Horn Inspection (For P-17, 24)............................9C-7
Horn Removal and Installation (For P-17, 24).....9C-8
Specifications .......................................................9C-8
Service Data........................................................9C-8
Tightening Torque Specifications........................9C-8
Special Tools and Equipment .............................9C-8
Recommended Service Material .........................9C-8
Special Tool ........................................................9C-8
Exterior Parts ........................................... 9D-1
Repair Instructions ..............................................9D-1
Exterior Parts Construction .................................9D-1
Rear Fender Heat Shield Construction ...............9D-3
Fuel Tank Lower Cover Heat Shield
Installation .........................................................9D-4
Fastener Removal and Installation......................9D-5
Front Side Exterior Parts Removal and
Installation .........................................................9D-6
Rear Side Exterior Parts Removal and
Installation .........................................................9D-9
Seat Removal and Installation ..........................9D-11
Under Cover Components ................................9D-12
Under Cover Removal and Installation .............9D-12
Body Structure......................................... 9E-1
Repair Instructions ..............................................9E-1
Body Frame Construction ...................................9E-1
Footrest Construction..........................................9E-2
Footrest Removal and Installation.......................9E-2
Carrier Construction ............................................9E-3
Front Carrier Removal and Installation ...............9E-3
Rear Carrier Removal and Installation ................9E-4
Front Grip Bar Construction ................................9E-5
Front Grip Bar Removal and Installation .............9E-5
Trailer Towing Construction ................................9E-6
Trailer Towing Removal and Instruction..............9E-6
Содержание 2009 LT-A500XP
Страница 2: ......
Страница 4: ......
Страница 14: ...00 9 Precautions ...
Страница 224: ...1E 3 Engine Lubrication System EXHAUST SIDE INTAKE SIDE I931H1150003 02 ...
Страница 304: ...1K 4 Exhaust System ...
Страница 346: ...2D 5 Wheels and Tires ...
Страница 438: ...3D 26 Propeller Shafts ...
Страница 482: ...4D 6 Parking Brake ...
Страница 512: ...5A 28 Automatic Transmission ...
Страница 582: ...9 ii Table of Contents Specifications 9E 7 Tightening Torque Specifications 9E 7 Special Tools and Equipment 9E 7 ...
Страница 624: ...Prepared by December 2008 Part No 99500 44080 03E Printed in U S A 624 ...