3B-5 Differential:
Installation
Install the front drive (differential) assembly in the
reverse order of removal. Pay attention to the following
points:
• Apply grease to spline and inside of the front propeller
shaft.
: Grease 99000–25160 (Water resistance
grease)
• Apply thread lock to the bolts and tighten the nuts to
the specified torque.
: Thread lock cement 99000–32030
(THREAD LOCK CEMENT SUPER 1303 or
equivalent)
Tightening torque
Front drive (differential) mounting nut (a): 50 N·m
(5.0 kgf-m, 36.0 lbf-ft)
• Attach the boot (1) to the input shaft.
• After installing the front drive (differential), check the
wiring harness routing and pour the front differential
gear oil. Refer to
“Wiring Harness Routing
Diagram: in Section 9A”
and
“Front Differential
Gear Oil Inspection: in Section 0B”
.
Front Drive (Differential) Assembly
Disassembly and Assembly
B931H23206006
Refer to “Front Drive (Differential) Assembly Removal
and Installation (Page 3B-4)”.
Disassembly
1) Remove the 4WD/diff-lock actuator assembly (1).
2) Remove the breather case (2).
3) Remove the front drive (differential) case cover bolts
diagonally and evenly.
I931H1320007-01
(a)
(a)
I931H1320099-01
1
I931H1320009-01
1
I931H1320010-01
2
I931H1320011-01
I931H1320012-01
Содержание 2009 LT-A500XP
Страница 2: ......
Страница 4: ......
Страница 14: ...00 9 Precautions ...
Страница 224: ...1E 3 Engine Lubrication System EXHAUST SIDE INTAKE SIDE I931H1150003 02 ...
Страница 304: ...1K 4 Exhaust System ...
Страница 346: ...2D 5 Wheels and Tires ...
Страница 438: ...3D 26 Propeller Shafts ...
Страница 482: ...4D 6 Parking Brake ...
Страница 512: ...5A 28 Automatic Transmission ...
Страница 582: ...9 ii Table of Contents Specifications 9E 7 Tightening Torque Specifications 9E 7 Special Tools and Equipment 9E 7 ...
Страница 624: ...Prepared by December 2008 Part No 99500 44080 03E Printed in U S A 624 ...