Oil Tank and secure by inserting Tie’s “serrated”
end into the 1/4” hole provided. Secure #1731 &
1732 Hoses with #793 Plastic Tie. (Check Photos)
33) Thread each of the three (3) Handles into
threaded shafts in forward end of #1920 Valve
Bank. Secure with lock nuts on each Handle
shaft.
34) Locate the two 5/16 holes in #1615 Cover
over mating # 1720 Rods... secure above with
Flange Nuts... tighten.
At this point, go through your completed assem-
bly Instructions and properly align and “finish
tighten” all Hose & Fitting connections and all
mounting Bolts & Clips. “Finish tighten”
both
the
items you had tightened previously and those
items you were told “not to tighten” during your as-
sembly steps.
34) Align the 5/16” holes in #1718 Cover with pro-
truding #1720 threaded studs in #1722 Valve. Se-
cure above with 5/16” Flange Nuts.
35) Screw ends of #192B Valve Handles into
“vertical“ or “horizontal” positions on threaded
ends of each Valve spool...secure with nut pro-
vided.
36) Carefully fill #1719 Oil Tank with AW32 Hy-
draulic Oil to approximately 5” to the top of Tank.
Close top of Tank with #616 Breather Cap...don’t
over tighten!. Replace (-) Ground Wire on (-) Neg-
ative post of Battery.
279
7”
Bundle of Hoses:
1736, 1737 & 1733
1729
616
793
1615
Flange
Nuts
1920B
Valve
Handles
1920B
Valve
Handles
Handles
BM61