8-22 Quadrupole filter cleaning
SRS Residual Gas Analyzer
Procedure
1.
Read all warnings
at the beginning of this chapter before attempting to service the
probe.
2. Set up in advance a clean dust-free working area where to carry out this procedure.
3. Turn off the RGA and disconnect the ECU from the probe.
4. Wait for the probe to cool down for at least 30 minutes after the emission is turned
off.
Severe burns can result if the probe is handled too soon
.
5. Without disconnecting the cover nipple from the vacuum port, remove the six bolts
from the feedthru flange at the end of the probe and carefully slide the entire probe
assembly out of the vacuum system. The ionizer, the filter, and the detector are now
fully exposed and easily accessible.
Probe Assembly
Feedthru Flange
Ionizer
Vacuum Chamber
Vacuum Port
RGA Cover Nipple
Figure 5 Probe Removal for Quadrupole Filter Cleaning
6. Carry the probe to a clean, dust free area immediately.
Avoid contamination
using
handling procedures compatible with high vacuum requirements.
7. Hold the probe in a secure upright position and do a thorough visual inspection of the
unit. Check for loose, damaged, misaligned and severely contaminated components.
If excessive contamination is evident take the necessary steps to identify and
eliminate the contamination sources in the vacuum system. Carefully inspect the
ionizer and, if any problems are detected, replace the filament and/or the ionizer as
part of this maintenance procedure. Inspect the CDEM for signs of arcing and
contamination. If necessary replace the CDEM as part of this maintenance procedure.
8.
Head disassembly:
Only a rough outline of the complete disassembly of the probe is
presented here. Use the
RGA Assembly Drawing
of Chapter 9 as a visual aid during
the process.
Note the placement of all parts and their orientation before disassembly!
Begin by removing the filament following the necessary steps from the “Filament
Replacement” procedure described in this chapter. Be very careful not to damage the
thoria coating if you intend to use the same filament during reassembly.
Next, remove the CDEM following steps from the “CDEM Replacement” procedure.
Store the multiplier in a dry box or desiccator. Loosen the seven screws that fasten
the 1/8” diameter rods to the feedthru connectors, and remove the bowed e-clip from
the exit plate align rod that is located right above the CDEM. You can now separate
Содержание RGA100
Страница 4: ...SRS Residual Gas Analyzer iv...
Страница 18: ...xviii Command List SRS Residual Gas Analyzer...
Страница 46: ...2 14 Residual Gas Analysis Basics SRS Residual Gas Analyzer...
Страница 66: ......
Страница 78: ...4 12 Mass Filter Power supply SRS Residual Gas Analyzer...
Страница 104: ......
Страница 107: ...Programming the RGA Head 6 3 SRS Residual Gas Analyzer Error Byte Definitions 6 69...
Страница 216: ...8 26 Quadrupole filter cleaning SRS Residual Gas Analyzer...
Страница 246: ...11 2 SRS Residual Gas Analyzer...
Страница 247: ......
Страница 248: ......
Страница 268: ...Appendix B SRS Residual Gas Analyzer 7...
Страница 310: ...Appendix D SRS Residual Gas Analyzer 25 Select TCP IP and click the Properties button to find the IP address...
Страница 312: ...Appendix D SRS Residual Gas Analyzer 27...
Страница 313: ...28 Appendix D SRS Residual Gas Analyzer...