8-6
Probe Bakeout
SRS Residual Gas Analyzer
Procedure
1. The quadrupole probe must be mounted on the vacuum system and at a base pressure
under 10
-6
Torr.
2. Turn off the RGA and disconnect the ECU from the probe.
3. Wrap a heating tape or heating jacket around the entire probe and cover with
fiberglass insulation if necessary. Make sure the entire probe, including flanges, is
evenly covered.
4. Bake the probe to at least 200
q
C for several hours (i.e. overnight).
5. After bakeout wait for the probe to cool down to room temperature before mounting
the ECU back on its flange.
6. Run the peak tuning procedure.
Содержание RGA100
Страница 4: ...SRS Residual Gas Analyzer iv...
Страница 18: ...xviii Command List SRS Residual Gas Analyzer...
Страница 46: ...2 14 Residual Gas Analysis Basics SRS Residual Gas Analyzer...
Страница 66: ......
Страница 78: ...4 12 Mass Filter Power supply SRS Residual Gas Analyzer...
Страница 104: ......
Страница 107: ...Programming the RGA Head 6 3 SRS Residual Gas Analyzer Error Byte Definitions 6 69...
Страница 216: ...8 26 Quadrupole filter cleaning SRS Residual Gas Analyzer...
Страница 246: ...11 2 SRS Residual Gas Analyzer...
Страница 247: ......
Страница 248: ......
Страница 268: ...Appendix B SRS Residual Gas Analyzer 7...
Страница 310: ...Appendix D SRS Residual Gas Analyzer 25 Select TCP IP and click the Properties button to find the IP address...
Страница 312: ...Appendix D SRS Residual Gas Analyzer 27...
Страница 313: ...28 Appendix D SRS Residual Gas Analyzer...