2.6 Voltage Protection 27, 59
142
SIPROTEC 4, 7SJ62/63/64 Handbuch
C53000-G1140-C147-A, Edition 07.2015
Overvoltage Pro-
tection - Negative
Sequence System
V2
The three-phase voltage transformer connection for the overvoltage protection can be
configured by means of parameter
614
OP. QUANTITY 59
. Either the largest of the
phase-to-phase voltages (
Vphph
) or the negative system voltage (
V2
) are evaluated
as measured quantities. The negative system detects negative sequence reactance
and can be used for the stabilization of the time overcurrent protection. With backup
protection of transformers or generators, the fault currents lie, in some cases, only
slightly over the load currents. To obtain a pickup threshold of the definite time over-
current protection which should be as sensitive as possible, it is necessary to stabilize
the definite time overcurrent protection by the voltage protection.
Overvoltage protection includes two elements. Thus, with configuration of the negative
system, a longer time delay (address
5004
,
59-1 DELAY
) may be assigned to the
lower element (address
5015
,
59-1 PICKUP V2
) and a shorter time delay (address
5007
,
59-2 DELAY
) may be assigned to the upper element (address
5016
,
59-2
PICKUP V2
). There are no clear cut procedures on how to set the pickup values
59-
1 PICKUP V2
or
59-2 PICKUP V2
, as they depend on the respective station con-
figuration. Since the negative sequence voltage V2 corresponds to a phase-ground
voltage, their threshold value must be set as such.
The parameter
5002
59-1 PICKUP
and
5005
59-2 PICKUP
or
5003
59-1 PICKUP
and
5006
59-2 PICKUP
are deleted during configuration of the negative sequence
voltage and the setting values are activated under the addresses
5015
59-1 PICKUP
V2
or
5016
59-2 PICKUP V2
. Be aware that the parameter device
614
OP.
QUANTITY 59
is ignored with single-pole voltage transformer connection and the ac-
tivation of the threshold value for the phase-to-phase voltages takes place. The time
delays of the overvoltage elements are entered at addresses
5004
59-1 DELAY
and
5007
59-2 DELAY
and should be selected to allow the brief voltage spikes that are
generated during switching operations and to enable clearance of stationary overvolt-
ages in time.
Dropout Threshold
of the Overvoltage
Protection
The dropout thresholds of the
59-1
element and the
59-2
element can be set via the
dropout ratio r = V
dropout
/V
pickup
(
5117
59–1 DOUT RATIO
or
5118
59–2 DOUT
RATIO
). In this, the following marginal condition always holds for r:
r · (configured pickup threshold )
≤
150 V with connection of phase-to-phase voltages
or
r · (configured pickup threshold )
≤
260 V with connection of phase-to-ground voltages.
The minimum hysteresis is 0.6 V.
Undervoltage Pro-
tection - Positive
Sequence System
V1
The positive sequence component (
V1
) is evaluated for the undervoltage protection.
Especially in case of stability problems, their acquisition is advantageous because the
positive sequence system is relevant for the limit of the stable energy transmission.
Concerning the pickup values, there are not clear cut procedures on how to set them.
However, because the undervoltage protection function is primarily intended to protect
induction machines from voltage dips and to prevent stability problems, the pickup
values will usually be between 60% and 85% of the nominal voltage. Please note that
with frequency deviations of > 5 Hz of the calculated r. m. s value of the voltage will be
too small and the device will perform unwanted operations.
With a three-phase connection and a single-phase connection of a phase-to-phase
voltage the thresholds are set as phase-phase quantities. Since the positive sequence
component of the voltages corresponds to a phase-ground voltage, their threshold
value has to be multiplied with
√
3. With a single-phase phase-to-ground connection
the threshold is set as phase-ground voltage.
Содержание siprotec SJ62
Страница 3: ...3 SIPROTEC 4 7SJ62 63 64 Handbuch C53000 G1140 C147 A Edition 07 2015 ...
Страница 9: ...Preface 9 SIPROTEC 4 7SJ62 63 64 Handbuch C53000 G1140 C147 A Edition 07 2015 ...
Страница 21: ...Contents 19 SIPROTEC 4 7SJ62 63 64 Handbuch C53000 G1140 C147 A Edition 07 2015 ...
Страница 35: ...1 Introduction 33 SIPROTEC 4 7SJ62 63 64 Handbuch C53000 G1140 C147 A Edition 07 2015 ...
Страница 365: ...2 Functions 363 SIPROTEC 4 7SJ62 63 64 Handbuch C53000 G1140 C147 A Edition 07 2015 ...
Страница 443: ...3 Mounting and Commissioning 441 SIPROTEC 4 7SJ62 63 64 Handbuch C53000 G1140 C147 A Edition 07 2015 ...
Страница 529: ...4 Technical Data 527 SIPROTEC 4 7SJ62 63 64 Handbuch C53000 G1140 C147 A Edition 07 2015 ...
Страница 699: ...A Appendix 697 SIPROTEC 4 7SJ62 63 64 Handbuch C53000 G1140 C147 A Edition 07 2015 ...
Страница 701: ...Literature 699 SIPROTEC 4 7SJ62 63 64 Handbuch C53000 G1140 C147 A Edition 07 2015 ...
Страница 714: ...Index 712 SIPROTEC 4 7SJ62 63 64 Handbuch C53000 G1140 C147 A Edition 07 2015 ...
Страница 715: ...Index 713 SIPROTEC 4 7SJ62 63 64 Handbuch C53000 G1140 C147 A Edition 07 2015 ...