Project Planning Manual
SIPART DR20
Planning example
S6
Cascade control
Process variables for both controllers from
resistance thermometers Pt 100
W
y
Drive
Y
R
Master
Slave
The master controller has a continuous output, the
slave controller is a three-position step controller.
The resistance thermometers are directly connected
to the analog inputs AE3 of both controllers.
The output signal of the master controller is the
remote setpoint of the slave controller and linked to
its analog input AE2.
Please refer to the remarks on page 108 and the note on page 15 !
Setting of configuring switches: S8 = 1
AE1
AE2
BE
BA
L+
GND GND
Iy
1
2
3
4
5
6
7
8
SIPART DR20 K
6DR2004-1 (AC 230 V)
6DR2004-2 (AC 115 V)
6DR2004-4
(UC 24 V)
1
2
3
4
1
2
3
4
1
2
3
4
PE
N
L
AC 115 V
AC 230 V
⎫
⎬
⎭
PE
N
UC 24 V
L
⎫
⎬
⎭
Slot 3 GW
Slot 2 AE4
Slot 1 AE3
5
M1
A1
R1
A2
M2
not equipped
M
M/A
S
E
Option module
6DR2800-8P
R
L1
R
L3
R
L4
Pt100
Master controller
not equipped
R
L1
= R
L3
= R
L4
≤
50
Ω
130
Содержание SIPART DR20
Страница 1: ...s Compact Controller SIPART DR20 Project Planning Manual 02 05 Order No 6ZB5600 0AAO2 0BA0 ...
Страница 2: ...Project Planning Manual SIPART DR20 empty page 2 ...
Страница 82: ...Project Planning Manual SIPART DR20 SIPART Bus Fig 5 12 SES bus driver remote system wiring diagram 82 ...
Страница 111: ...SIPART DR20 Project Planning Manual Empty page 111 ...