Installing and putting a TIM into operation
4.5 Configuration
SINAUT ST7 station control system
System Manual, 09/2016, C79000-G8976-C178-10
133
Figure 4-4
Connecting TIM 3V-IE variants and the TIM 4R-IE to the power supply
Note
If one or more TIMs are installed as a CP in an S7-300 device, the CPU and TIMs must be
connected to the same power supply. This ensures that the CPU and TIMs start up at the
same time when the power supply is turned on.
4.5
Configuration
Configuring the TIM
In volume 2 "Software" of the SINAUT ST7 system manual, you will find a detailed
description of configuring the TIM. Configuration and loading the configuration data on the
station are necessary to obtain an operable TIM.
4.6
Startup activities of the TIM module
4.6.1
Startup of the TIM 3V-IE variants
Introduction
During startup, the LEDs on the front panel of the TIM 3V-IE variants have a different
significance than during normal operation. They are optical indicators of the various startup
phases and provide detailed information about any errors detected during startup. The only
exceptions are the LINK and RX/TX LEDs that have no significance during the startup of the
TIM 3V-IE variants.
Содержание SIMATIC NET TeleControl SINAUT ST7
Страница 10: ...Preface SINAUT ST7 station control system 10 System Manual 09 2016 C79000 G8976 C178 10 ...
Страница 274: ...References 8 SINAUT ST7 station control system 274 System Manual 09 2016 C79000 G8976 C178 10 ...
Страница 292: ...Glossary SINAUT ST7 station control system 292 System Manual 09 2016 C79000 G8976 C178 10 ...