
Operator Manual
4
of 24
SPR2-310.620.30.02.02
Options
Spacer
0
The distance between the source and tube assembly cover (shortest possible
source-skin distance) is
≥
200 mm with the standard system (acc. to IEC 601-1-3).
Country-specific regulations may require a larger source-skin distance (
≥
300 mm
acc. to DHHS 21CFR). This is achieved by attaching an additional spacer to the
C-arm system.
(1) Knurled screws
◆
If this source-skin distance is too large for special examinations, the spacer
can be removed by loosening the knurled screws.
– After these examinations, the spacer must be reattached to ensure the
reduction in skin dose resulting from a greater source-skin distance.
Grounding cable
0
An optional grounding cable is available for equipotential bonding in accordance
with DIN 57107/VDE 0107 for rooms of Application Group 2E (cardiac catheter-
ization).
(1)
Содержание ARCADIS Varic
Страница 2: ......
Страница 3: ...www siemens com healthcare ARCADIS Varic Operator Manual ...
Страница 6: ......
Страница 8: ......
Страница 12: ...Operator Manual 2 of 8 SPR2 310 620 30 02 02 Introduction ...
Страница 90: ...Operator Manual 44 of 44 SPR2 310 620 30 02 02 System Description ...
Страница 150: ...Operator Manual 60 of 60 SPR2 310 620 30 02 02 Patient data ...
Страница 284: ...Operator Manual 4 of 98 SPR2 310 620 30 02 02 Documentation ...
Страница 380: ...Operator Manual 2 of 24 SPR2 310 620 30 02 02 Configuration ...
Страница 436: ...Operator Manual 34 of 34 SPR2 310 620 30 02 02 Technical Data ...
Страница 438: ...Operator Manual 2 of 16 SPR2 310 620 30 02 02 Maintenance ...
Страница 454: ...Operator Manual 2 of 24 SPR2 310 620 30 02 02 Options ...