
I t e m
D e s c r i pt i o n
D ate Se ttin g
Configu re th e date on w h ic h you want to ope rate the mac
h in e with a spec ific patte rn .
S ele c t a day be tw een 1 and 31 in Eve ry Mon th or from En d
of Eve ry Mon th .
Applie d Ene rgy Savin g Op
e ration
S ele c t an e n ergy savin g patte n you w an t to apply.
Use th e " Patte rn " tab to spe c ify the de tails of the e ne rgy
savin g patte rn .
Operation for Holiday
Configu re ho w th e mach in e ope rate s if th e pre se t spec ific
date falls on a holiday.
Use th e " Holiday" tab to spe cify th e day as th e h oliday.
"Pattern" tab
This tab is used to configure the details of an energy saving pattern.
I t e m
D e s c r i pt i o n
En erg y S ave Ope ration
S elec t a spe c ific date pattern you wan t to spe c ify.
Chan ge Pattern Name
Ente r a patte rn name wh en you want to ch an ge th e name
of a s pe cific date patte rn .
Patte rn to Be Mode le d
S elec t a sou rc e patte rn w he n you c re ate a patte rn u sin g a
store d or prese t patte rn.
Add new sc he dule .
Add a sc he du le .
"Holi day" tab
Specify a holiday. The day you specified as the holiday will not be a specific
date.
If a spec ific date that is initially spec ifie d co in cide s w ith the on e that is
move d be c au se it falls on a h oliday, the s ettin g for th e forme r tak es
prec e de nc e .
If spe cific date s of th e s ame dates are c on fig ured, th ey are u se d in
asc e n ding orde r be twe en 1 an d 7 (specific date n umbe rs).
USER'S MANUAL | MX-M365N/MX-M465N/MX-M565N USER'S ...
http://siica.sharpusa.com/portals/0/downloads/Manuals/MX-M365N-M...
1220 of 1441
3/17/2016 7:14 AM