Service Manual
73
Figure 104: Control Cluster Fasteners
2.8 N-m (2.0 ft-lbf)
Controls
Installation
1. Make sure the SE-3 Patroller is powered off,
unplugged, and the parking brake is engaged.
2. Slide the Control Cluster onto the handlebar.
3. Leave a small gap (
5 mm
) between the Control
Cluster and the Handlebar Grip.
4. Orient the Control Cluster so the bottom is parallel to
the ground (
0°
).
5. Using a T15 Torx wrench, install the three fasteners.
Torque to
2.8 N-m (2.0 ft-lbf)
.
NOTICE
Tighten the fasteners carefully to make sure the two
halves align correctly with each other.
6. Connect the wire harness. See
Figure 103
.
7. Install two cable ties around the harnesses on the
steering column.
8. Install the following components:
a. Front Cowl (
page 17
)
b. Glove Box (
page 16
)
c. Bib Panel (
page 14
)
d. Storage Trays (
page 13
)
e. Battery Module (
page 8
)
9. Perform post-service tests (
page 127
).
Содержание SE-3 Patroller
Страница 1: ...Service Manual SE 3 Patroller...
Страница 12: ...SE 3 Patroller 4 General Safety Precautions...
Страница 18: ...SE 3 Patroller 10 Battery Module...
Страница 76: ...SE 3 Patroller 68 Brakes...
Страница 88: ...SE 3 Patroller 80 Siren...
Страница 92: ...SE 3 Patroller 84 Rider Detect Mat...
Страница 114: ...SE 3 Patroller 106 Power Interface...
Страница 134: ...SE 3 Patroller 126 Harnesses...
Страница 147: ......
Страница 148: ...24538 00001 ad...