Rockwell Automation Publication 193-UM015D-EN-P - February 2015
23
Chapter
2
Installation and Wiring
Introduction
This chapter provides instructions for receiving, unpacking, inspecting, and
storing the E300™ Electronic Overload Relay. Assembly, installation, and wiring
instructions for common applications are also included in this chapter.
Receiving
It is your responsibility to thoroughly inspect the equipment before accepting the
shipment from the freight company. Check the item(s) received against the
purchase order. If any items are damaged, it is your responsibility not to accept
delivery until the freight agent has noted the damage on the freight bill. If any
concealed damage is found during unpacking, it is again your responsibility to
notify the freight agent. The shipping container must be left intact and the
freight agent should be requested to make a visual inspection of the equipment.
Unpacking/Inspecting
Remove all packing material from around the E300 Electronic Overload Relay.
After unpacking, check the item’s nameplate catalog number against the purchase
order.
Storing
The E300 Electronic Overload Relay should remain in its shipping container
before installation. If you will not use the equipment immediately, you must store
it according to the following instructions to maintain warranty coverage:
•
Store in a clean, dry location.
•
Store within an ambient temperature range
of -40…+85 °C (-40…+185 °F).
•
Store within a relative humidity range of 0…95%, non-condensing.
•
Do not store where the device could be exposed to a corrosive atmosphere.
•
Do not store in a construction area.
Содержание Allen-Bradley E300
Страница 1: ...E300 Electronic Overload Relay Bul 193 592 User Manual...
Страница 124: ...124 Rockwell Automation Publication 193 UM015D EN P February 2015 Chapter 4 System Operation and Configuration Notes...
Страница 128: ...128 Rockwell Automation Publication 193 UM015D EN P February 2015 Chapter 5 Operating Modes...
Страница 292: ...292 Rockwell Automation Publication 193 UM015D EN P February 2015 Chapter 6 Protective Trip and Warning Functions...
Страница 304: ...304 Rockwell Automation Publication 193 UM015D EN P February 2015 Chapter 7 Commands Notes...
Страница 372: ...372 Rockwell Automation Publication 193 UM015D EN P February 2015 Chapter 8 Metering and Diagnostics...
Страница 460: ...460 Rockwell Automation Publication 193 UM015D EN P February 2015 Appendix A Specifications Notes...
Страница 501: ...Rockwell Automation Publication 193 UM015D EN P February 2015 501 Parameter List AppendixB Notes...
Страница 502: ...502 Rockwell Automation Publication193 UM015D EN P November 2013 Appendix B Parameter List...
Страница 545: ......