![Rion KL-04 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/rion/kl-04/kl-04_instruction-manual_1463442026.webp)
10
Preparation
Connecting Sampling Tube
The PFA sampling tube set provided contains a sampling tube (2×4 dia. length 100 mm)
and nut. They need to be connected according to the following procedure.
1. Remove the end plug from the INLET connector by turning the end plug counter-
clockwise.
2. Loosen the nut of the sampling tube by turning it counterclockwise, and remove
the plug from the sampling tube.
Important
Store the end plug and plug together in a safe place. The
end plug will be needed when the unit is sent to the supplier
for servicing and maintenance. The plugs will be needed
again when removing the sampling tube for storage.
End plug
INLET
Plug
Sampling tube
Nut
Plug
Nut
Sampling tube
Содержание KL-04
Страница 2: ......
Страница 6: ...iv...
Страница 10: ...viii...
Страница 12: ...x...
Страница 16: ...xiv...
Страница 166: ...No 31947 06 11 Printed in Japan...