2.3.5 Discharge mechanism
The residual charge of the OPC surface is removed from
the inside of the unit by the quenching lamp (fluorescent
lamp). Since the belt is illuminated from the inside, the
charge is removed regardless of the influence of the
toner setting on the OPC surface. The light of the lamp
is applied from the T/S corona unit to the cleaning roller,
thus enhancing the transfer efficiency and cleaning
efficiency.
The area exposed to light from the lamp is covered with
a transparent, yellow cover (filter) to protect the OPC
belt against harmful ultraviolet radiation that can cause
optical fatigue.
The discharge brush removes the charge on the OPC
belt (base) produced by friction during operation. This
prevents electric shocks to technicians when they
perform maintenance on the machine.
2.3.6 OPC belt damage prevention mechanism
Rubber rollers are used in the OPC unit. When
developer or cleaning carrier enters the rear of the OPC
belt, the developer or cleaning carrier transfers to the
roller surface. This prevents the carrier from damaging
the OPC.
All rollers other than the drive roller use low-friction
rubber to help slipping of the belt during tracking.
Discharge
brush
QL stabilizer
Lamp cover
Quenching lamp
LIght
output angle
OPC
Belt roller
Developer
1 July 1994
OPC Unit
2-31
Содержание PCU10
Страница 3: ...SECTION 1 OVERALL MACHINE INFORMATION...
Страница 36: ...SECTION 2 SECTIONAL DESCRIPTIONS...
Страница 46: ...2 1 11 Paper feed operation Circuit diagram Paper Feed 1 July 1994 2 10...
Страница 59: ...2 2 7 Optics operation Circuit diagram 1 July 1994 Optics 2 23...
Страница 69: ...2 3 9 OPC unit operation Circuit diagram 1 July 1994 OPC Unit 2 33...
Страница 76: ...2 4 5 Charging operation Circuit diagram OPC Charge 1 July 1994 2 40...
Страница 82: ...2 5 4 Eraser operation Circuit diagram Erase 1 July 1994 2 46...
Страница 86: ...2 6 7 Transfer separation operation Circuit diagram Image Transfer and Paper Separation 1 July 1994 2 50...
Страница 94: ...2 7 7 Cleaning unit operation Circuit diagram Cleaning 1 July 1994 2 58...
Страница 100: ...2 8 7 Timing chart OPC Filming Removal 1 July 1994 2 64...
Страница 106: ...2 9 11 Development operation Circuit diagram Development 1 July 1994 2 70...
Страница 121: ...2 11 3 Process control flow 1 July 1994 Process Control 2 85...
Страница 138: ...2 13 9 Duplex exit operation Circuit diagram Duplex and Paper Exit 1 July 1994 2 102...
Страница 152: ...2 14 8 Timing chart SADF mode Condition Two A4 copies from an A4 original ADF 1 July 1994 2 116...
Страница 153: ...Single side original mode with sort stack mode Condition One A4 copy each from three originals 1 July 1994 ADF 2 117...
Страница 154: ...Duplex original mode with stack mode Condition One A4 copy from one original ADF 1 July 1994 2 118...
Страница 156: ...ADF 1 July 1994 2 120...
Страница 161: ...Exit sensor 1 July 1994 ADF 2 125...
Страница 162: ...2 14 10 ADF operation Circuit diagram ADF 1 July 1994 2 126...
Страница 178: ...2 16 9 LCT operation Circuit diagram Large Capacity Tray 1 July 1994 2 142...
Страница 179: ...DC drive board paper feed motor DC drive board DC motor AC 230V 1 July 1994 Large Capacity Tray 2 143...