1256E User Manual
Getting Started 2-4
Racal Instruments
©
2002
Figure 2-3, Numbering of Switch Plug-In Slots
Connecting to
Plug-Ins
For information about connecting the switch plug-ins to your
external hardware, refer to the user manuals of the individual plug-
ins.
Activating Main
AC Power
You are now ready to apply power to the 1256 Switching System.
See
Figure 2-4, Activating Main AC Power
for instructions on
activating main power.
Figure 2-4, Activating Main AC Power
To apply power, set
power switch to 1
Slot 1
Slot 2
Slot 3
Slot 4
Slot 6
Slot 5
Slot 7
Slot 8
Содержание 1256E
Страница 5: ......
Страница 6: ...This page was left intentionally blank...
Страница 20: ...1256E User Manual Introduction 1 6 Racal Instruments 2002 This page was left intentionally blank...
Страница 30: ...1256E User Manual Getting Started 2 10 Racal Instruments 2002 This page was left intentionally blank...
Страница 96: ...1256E User Manual Computer Interfaces 4 32 Racal Instruments 2002 This page was left intentionally blank...
Страница 104: ...1256E User Manual SCPI Command Basics 5 8 Racal Instruments 2002 Figure 5 1 IEEE 488 2 Status Reporting Model...
Страница 146: ...1256E User Manual SCPI Command Reference 6 6 Racal Instruments 2002...
Страница 179: ...1256E User Manual Racal Instruments 2002 Advanced SCPI Operations 8 15 select input and output trigger sources and so on...
Страница 190: ...1256E User Manual Product Support 9 4 Racal Instruments 2002 This page was left intentionally blank...