ActiveScale™ OS X100 Rackless Installation Guide
207
Table 14
-
8. Three-phase across three PDUs - PDU 3
14.6.2 Programming the PDUs
PDU reprogramming is done using the PDU firmware CLI. You can access the CLI using one of the
following methods:
• A serial (RS232) port
• An Ethernet port
14.6.2.1 Connecting to the PDU with a serial port
The PDU has an RJ45 serial RS-232 port. Use a RJ45-to-DB9F serial port adapter to connect using a PC or
networked terminal server.
Serial port connections require either a terminal or terminal emulation software configured to support
VT100/ANSI. The serial port also requires the following settings:
Branch ZX
Plug
Current (A)
Component
Port
Time on (s)
C-13
2.02
System Expansion Node 3 28
30
C-13
1.15
Storage Node 5
26
50
C-13
1.16
System Node 3
24
20
C-13
4.3
Storage Enclosure Basic 5 23
10
C-13
1.06
System Interconnect 2
22
0
9.69 Total
Branch YZ
Plug
Current (A)
Component
Port
Time on (s)
C-13
1.15
Storage Node 4
17
60
C-13
1.15
Storage Node 3
16
50
C-13
4.3
Storage Enclosure Basic 4 15
40
C-13
4.3
Storage Enclosure Basic 3 13
10
10.9 Total
Branch XY
Plug
Current (A)
Component
Port
Time on (s)
C-13
2.02
System Expansion Node 1 8
30
C-13
1.15
Storage Node 2
7
60
C-13
4.3
Storage Enclosure Basic 2 6
50
C-13
1.16
System Node 1
3
10
9.69 Total
Содержание ActiveScale X100
Страница 1: ...ActiveScale X100 Rackless Instalation Guide 6 68841 03 Rev A with ActiveScale OS 6 0 2 software...
Страница 28: ...ActiveScale OS X100 Rackless Installation Guide 28...
Страница 34: ...ActiveScale OS X100 Rackless Installation Guide 34...
Страница 36: ...ActiveScale OS X100 Rackless Installation Guide 36 Assemble the remaining Storage Enclosure Basics on page 66...
Страница 59: ...ActiveScale OS X100 Rackless Installation Guide 59 Figure 3 14 Installing the I O module...
Страница 68: ...ActiveScale OS X100 Rackless Installation Guide 68...
Страница 76: ...ActiveScale OS X100 Rackless Installation Guide 76...
Страница 80: ...ActiveScale OS X100 Rackless Installation Guide 80 Figure 5 30 Rail attaching to front vertical rail...
Страница 91: ...ActiveScale OS X100 Rackless Installation Guide 91 Figure 6 36 Cabling Storage Node 4...
Страница 92: ...ActiveScale OS X100 Rackless Installation Guide 92 Figure 6 37 Cabling Storage Node 5...
Страница 94: ...ActiveScale OS X100 Rackless Installation Guide 94 Figure 6 39 Cabling System Node 1...
Страница 95: ...ActiveScale OS X100 Rackless Installation Guide 95 Figure 6 40 Cabling System Node 2...
Страница 98: ...ActiveScale OS X100 Rackless Installation Guide 98...
Страница 108: ...ActiveScale OS X100 Rackless Installation Guide 108...
Страница 110: ...ActiveScale OS X100 Rackless Installation Guide 110...
Страница 127: ...ActiveScale OS X100 Rackless Installation Guide 127 Figure 10 19 Post Login Storage Policy...
Страница 155: ...ActiveScale OS X100 Rackless Installation Guide 155 Figure 10 47 Post Login Durability Policy...
Страница 162: ...ActiveScale OS X100 Rackless Installation Guide 162...
Страница 234: ...ActiveScale OS X100 Rackless Installation Guide 234...
Страница 238: ...ActiveScale OS X100 Rackless Installation Guide 238...
Страница 240: ...ActiveScale OS X100 Rackless Installation Guide 240...
Страница 244: ...ActiveScale OS X100 Rackless Installation Guide 244...
Страница 260: ...ActiveScale OS X100 Rackless Installation Guide 260...
Страница 262: ...ActiveScale OS X100 Rackless Installation Guide 262 Figure 21 20 Components and port identification...
Страница 263: ...ActiveScale OS X100 Rackless Installation Guide 263 Figure 21 21 ActiveScale X100 cable wiring key...
Страница 264: ...ActiveScale OS X100 Rackless Installation Guide 264...