ActiveScale™ OS X100 Rackless Installation Guide
245
20 PDU specifications
This appendix defines the requirements for the PDUs to be used in the ActiveScale X100 system rack. It is
not intended to be a full description of the PDU selected. The PDU may have additional features not
required by this application.
Topics:
•
•
•
•
•
As a reference, the following PDUs have been qualified for use with ActiveScale X100:
Note:
Multiple PDUs are required based on the expected power draw of the
system.
• Three-phase
– 3 Phase, Zero U, 208V, Delta, 24A: Server Technology Inc. STV-4502M/HG
– 3 Phase, Zero U, 400V, Wye, 32A: Server Technology Inc. STV-6503K/HG
– 3 Phase, Zero U, 208V, Delta, 30A: Server Technology Inc. STV-4502E
– 3 Phase, Zero U, 380V, Wye, 16A: Server Technology Inc. STV-4503J
• Single-phase
– 1 Phase, Zero U, 208V, 30A: Server Technology Inc. STV-4501C/HG
– 1 Phase, Zero U, 230V, 32A: Server Technology Inc. STV-6501K/HG
Содержание ActiveScale X100
Страница 1: ...ActiveScale X100 Rackless Instalation Guide 6 68841 03 Rev A with ActiveScale OS 6 0 2 software...
Страница 28: ...ActiveScale OS X100 Rackless Installation Guide 28...
Страница 34: ...ActiveScale OS X100 Rackless Installation Guide 34...
Страница 36: ...ActiveScale OS X100 Rackless Installation Guide 36 Assemble the remaining Storage Enclosure Basics on page 66...
Страница 59: ...ActiveScale OS X100 Rackless Installation Guide 59 Figure 3 14 Installing the I O module...
Страница 68: ...ActiveScale OS X100 Rackless Installation Guide 68...
Страница 76: ...ActiveScale OS X100 Rackless Installation Guide 76...
Страница 80: ...ActiveScale OS X100 Rackless Installation Guide 80 Figure 5 30 Rail attaching to front vertical rail...
Страница 91: ...ActiveScale OS X100 Rackless Installation Guide 91 Figure 6 36 Cabling Storage Node 4...
Страница 92: ...ActiveScale OS X100 Rackless Installation Guide 92 Figure 6 37 Cabling Storage Node 5...
Страница 94: ...ActiveScale OS X100 Rackless Installation Guide 94 Figure 6 39 Cabling System Node 1...
Страница 95: ...ActiveScale OS X100 Rackless Installation Guide 95 Figure 6 40 Cabling System Node 2...
Страница 98: ...ActiveScale OS X100 Rackless Installation Guide 98...
Страница 108: ...ActiveScale OS X100 Rackless Installation Guide 108...
Страница 110: ...ActiveScale OS X100 Rackless Installation Guide 110...
Страница 127: ...ActiveScale OS X100 Rackless Installation Guide 127 Figure 10 19 Post Login Storage Policy...
Страница 155: ...ActiveScale OS X100 Rackless Installation Guide 155 Figure 10 47 Post Login Durability Policy...
Страница 162: ...ActiveScale OS X100 Rackless Installation Guide 162...
Страница 234: ...ActiveScale OS X100 Rackless Installation Guide 234...
Страница 238: ...ActiveScale OS X100 Rackless Installation Guide 238...
Страница 240: ...ActiveScale OS X100 Rackless Installation Guide 240...
Страница 244: ...ActiveScale OS X100 Rackless Installation Guide 244...
Страница 260: ...ActiveScale OS X100 Rackless Installation Guide 260...
Страница 262: ...ActiveScale OS X100 Rackless Installation Guide 262 Figure 21 20 Components and port identification...
Страница 263: ...ActiveScale OS X100 Rackless Installation Guide 263 Figure 21 21 ActiveScale X100 cable wiring key...
Страница 264: ...ActiveScale OS X100 Rackless Installation Guide 264...