ActiveScale™ OS X100 Rackless Installation Guide
31
Note:
Component tolerances in the rack can be very tight. Consequently, when
measuring rack dimensions, measure to the millimeter or 1/32 of an inch.
Table 2
-
4. Rack considerations for the ActiveScale X100
Weight
Dynamic
: Support 12G dynamic load (approximately 24,000 lbs (10886 kg) static load)
Static
: 907.25 kg (2000 lbs) supported
Considerations
• If the rack cannot support the weight of the ActiveScale X100, the components can be split
between two adjacent racks. However, this will most likely require the use of longer network
cables. (A three-phase split rack kit (1EX0282) or a single-phase split rack kit (1EX0284) can
be ordered from Quantum Corporation which contain longer cables).
• A rack that supports slightly less than the static weight of an ActiveScale X100 could possibly
be used if the PDUs can be mounted in other, adjacent racks. But this is not considered a best
practice in most data centers.
• A rack that supports slightly less than the static weight of an ActiveScale X100 could possibly
be used if the user can accept severe restrictions to the scale-up capabilities of the ActiveScale
X100. That is, if each Storage Enclosure Basic contains only one or two fully populated sleds
each--and the system will never be scaled up--then the weight the rack will need to support will
be less.
Note:
Before installing ActiveScale X100 in a rack that does not meet the weight support
requirements, or before splitting the ActiveScale X100 components between racks, contact
Quantum Corporation support.
Height
Cabinet height
: no restrictions
Vertical rack units
: 38U
Considerations
• If you are using horizontal PDUs, you will need to add additional U space to the 38U
ActiveScale X100 requirement.
• If other equipment will also reside in the rack, you will need to ensure that ActiveScale X100
has at least 38Us as well as sufficient open power receptacles in the PDUs.
Width
Cabinet Width
: 23 9/16" (599 mm) or wider
Vertical rail width
: 19in (483 mm) (EIA-310-D specification for vertical rails)
Considerations
• The SAS connections and power connections for Storage Enclosure Basics are at the front of
the component, and the power cables and data cables will need to be threaded to the back of the
rack. In some cases the width of the cabinet allows the power cable molding to be threaded
from the side of the front rail. In other cases, the front rail can be set back 2 1/2" (65 mm) to
allow the power cable moldings to be threaded between the front vertical rail and the cabinet.
Содержание ActiveScale X100
Страница 1: ...ActiveScale X100 Rackless Instalation Guide 6 68841 03 Rev A with ActiveScale OS 6 0 2 software...
Страница 28: ...ActiveScale OS X100 Rackless Installation Guide 28...
Страница 34: ...ActiveScale OS X100 Rackless Installation Guide 34...
Страница 36: ...ActiveScale OS X100 Rackless Installation Guide 36 Assemble the remaining Storage Enclosure Basics on page 66...
Страница 59: ...ActiveScale OS X100 Rackless Installation Guide 59 Figure 3 14 Installing the I O module...
Страница 68: ...ActiveScale OS X100 Rackless Installation Guide 68...
Страница 76: ...ActiveScale OS X100 Rackless Installation Guide 76...
Страница 80: ...ActiveScale OS X100 Rackless Installation Guide 80 Figure 5 30 Rail attaching to front vertical rail...
Страница 91: ...ActiveScale OS X100 Rackless Installation Guide 91 Figure 6 36 Cabling Storage Node 4...
Страница 92: ...ActiveScale OS X100 Rackless Installation Guide 92 Figure 6 37 Cabling Storage Node 5...
Страница 94: ...ActiveScale OS X100 Rackless Installation Guide 94 Figure 6 39 Cabling System Node 1...
Страница 95: ...ActiveScale OS X100 Rackless Installation Guide 95 Figure 6 40 Cabling System Node 2...
Страница 98: ...ActiveScale OS X100 Rackless Installation Guide 98...
Страница 108: ...ActiveScale OS X100 Rackless Installation Guide 108...
Страница 110: ...ActiveScale OS X100 Rackless Installation Guide 110...
Страница 127: ...ActiveScale OS X100 Rackless Installation Guide 127 Figure 10 19 Post Login Storage Policy...
Страница 155: ...ActiveScale OS X100 Rackless Installation Guide 155 Figure 10 47 Post Login Durability Policy...
Страница 162: ...ActiveScale OS X100 Rackless Installation Guide 162...
Страница 234: ...ActiveScale OS X100 Rackless Installation Guide 234...
Страница 238: ...ActiveScale OS X100 Rackless Installation Guide 238...
Страница 240: ...ActiveScale OS X100 Rackless Installation Guide 240...
Страница 244: ...ActiveScale OS X100 Rackless Installation Guide 244...
Страница 260: ...ActiveScale OS X100 Rackless Installation Guide 260...
Страница 262: ...ActiveScale OS X100 Rackless Installation Guide 262 Figure 21 20 Components and port identification...
Страница 263: ...ActiveScale OS X100 Rackless Installation Guide 263 Figure 21 21 ActiveScale X100 cable wiring key...
Страница 264: ...ActiveScale OS X100 Rackless Installation Guide 264...