![PURSUIT 3000 EXPRESS Скачать руководство пользователя страница 83](http://html1.mh-extra.com/html/pursuit/3000-express/3000-express_owners-manual_1628296083.webp)
3000 EXPRESS
Drop Curtain (Option)
7. Slide all three drop curtain panels onto the rear track of the hardtop.
8. Zip all the panels together.
9. Start on the port side and zip the drop curtain to the side curtain.
10. Stretch the drop curtain to the starboard side and zip the drop curtain to the starboard side
curtain. Do not snap any of the snaps until you have zipped everything together.
11. Stretch the corners of the drop curtain over the hardtop rails and then snap to the hardtop.
12. Finish by snapping the rest of the fasteners.
If you have any difficulties or questions concerning the installation of the canvas, please call
Pursuit Customer Relations at 1-800-947-8778.
Note:
Cold weather can make the clear vinyl material on the curtains stiff and difficult
to stretch to the snaps. This can be particularly difficult with new canvas that has
been stored off the boat. Laying the curtains in the sun for 30 minutes during the
heat of the day will make installing them much easier in cold weather.
The warranty for the hard top or arch will be void if they are modified in any way or heavy
accessories like life rafts or electronics lockers are mounted to the top. Additionally, if items like
radar antennas spotlights and other accessories are mounted in the wrong location, the warranty
could be void. If you intend to add equipment or make modifications to the hard top or arch, you
should contact Pursuit Customer Relations to make sure the equipment you would like to add or
the intended modification will not void the warranty on the top.
9-9
Содержание 3000 EXPRESS
Страница 2: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 4: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 6: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 16: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 28: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 34: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 42: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 58: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 74: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 84: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 128: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 129: ...3000 EXPRESS Chapter 15 SCHEMATICS 15 1 12 Volt Wiring Schematic...
Страница 130: ...3000 EXPRESS 15 2 AC Wiring Schematic...
Страница 131: ...3000 EXPRESS Battery Cable Schematic 15 3...
Страница 132: ...3000 EXPRESS 15 4 Hydraulic Steering System...
Страница 133: ...3000 EXPRESS 15 5 Gas Fuel System...
Страница 134: ...3000 EXPRESS 15 6 Diesel Fuel System...
Страница 135: ...3000 EXPRESS Fresh Water System 15 7...
Страница 136: ...3000 EXPRESS Bridge Deck Raw Water System 15 8...
Страница 137: ...3000 EXPRESS 15 9 Head Plumbing System...
Страница 138: ...3000 EXPRESS 15 10 Drainage System...
Страница 139: ...3000 EXPRESS Bridge Deck Drainage System Bridge Deck Plumbing 15 11...
Страница 140: ...3000 EXPRESS Sling Positions 15 12...
Страница 149: ...3000 EXPRESS Appendix B Hours Date Dealer Service Repairs MAINTENANCE LOG B 1...
Страница 150: ...3000 EXPRESS Hours Date Dealer Service Repairs MAINTENANCE LOG B 2...
Страница 151: ...3000 EXPRESS Hours Date Dealer Service Repairs MAINTENANCE LOG B 3...
Страница 152: ...3000 EXPRESS Hours Date Dealer Service Repairs MAINTENANCE LOG B 4...
Страница 153: ...3000 EXPRESS Hours Date Dealer Service Repairs MAINTENANCE LOG B 5...
Страница 154: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...