![PURSUIT 3000 EXPRESS Скачать руководство пользователя страница 124](http://html1.mh-extra.com/html/pursuit/3000-express/3000-express_owners-manual_1628296124.webp)
3000 EXPRESS
the overboard discharge valve and activate the macerator pump until the antifreeze solution is
visible at the discharge thru hull.
Note:
Make sure you follow the marine toilet manufacturer's winterizing instructions
exactly.
Air Conditioner
Disconnect and drain the air conditioner intake and discharge hoses. Remove all water from the
sea strainer and thru hull fitting. Allow all water to drain from the system. The air conditioner
components must be properly winterized by following winterizing procedure in the air condi-
tioner owner’s manual.
Note:
The air conditioning, engine control system, head, and steering systems have
specific lay-up requirements. Please refer to their owner’s manuals for recom-
mended winterizing procedures.
Bilge
Coat all metal components, wire busses, and connector plugs in the bilge with a protecting oil.
It is also important to protect all strainers, seacocks and steering components. The bilge pumps
and bilge pump lines must be completely free of water and dried out when the boat is laid up for
the winter in climates where freezing occurs. Compartments in the bilge that will not drain
completely should be pumped out and then sponged until completely free of water. Dry the hull
bilge and self-bailing cockpit troughs. Water freezing in these areas could cause damage.
Hardtop and Radar Arch
It is imperative that all drain holes in the legs are open and that the legs are completely free of
water. Remove the canvas and thoroughly clean and store in a safe, dry place. Remove all
electronics. Coat all wire connectors and bus bars in the helm compartment with a protecting oil.
Clean the aluminum frame with soap and water and dry thoroughly. Apply an aluminum metal
protector to the entire frame to reduce corrosion and pitting.
ALWAYS MAKE SURE THE LEG DRAIN HOLES ARE CLEAR WHEN THE BOAT
IS LAID UP FOR THE WINTER. WATER TRAPPED INSIDE THE HARDTOP OR
RADAR ARCH LEGS COULD FREEZE AND CAUSE THE LEGS TO SPLIT.
Tower (if installed)
It is imperative that all drain holes in the tower and hardtop legs are open and completely free
of water. Tower basket drains should be checked and clear of debris. Remove the tower sun
shade, if installed, and belly band or removable cushions and thoroughly clean and store in a safe,
dry place. Remove all electronics. Coat all wire connectors and bus bars in the helm
compartment with a protecting oil. Cover the tower basket with a tarp and secure it properly.
14-6
Содержание 3000 EXPRESS
Страница 2: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 4: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 6: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 16: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 28: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 34: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 42: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 58: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 74: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 84: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 128: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...
Страница 129: ...3000 EXPRESS Chapter 15 SCHEMATICS 15 1 12 Volt Wiring Schematic...
Страница 130: ...3000 EXPRESS 15 2 AC Wiring Schematic...
Страница 131: ...3000 EXPRESS Battery Cable Schematic 15 3...
Страница 132: ...3000 EXPRESS 15 4 Hydraulic Steering System...
Страница 133: ...3000 EXPRESS 15 5 Gas Fuel System...
Страница 134: ...3000 EXPRESS 15 6 Diesel Fuel System...
Страница 135: ...3000 EXPRESS Fresh Water System 15 7...
Страница 136: ...3000 EXPRESS Bridge Deck Raw Water System 15 8...
Страница 137: ...3000 EXPRESS 15 9 Head Plumbing System...
Страница 138: ...3000 EXPRESS 15 10 Drainage System...
Страница 139: ...3000 EXPRESS Bridge Deck Drainage System Bridge Deck Plumbing 15 11...
Страница 140: ...3000 EXPRESS Sling Positions 15 12...
Страница 149: ...3000 EXPRESS Appendix B Hours Date Dealer Service Repairs MAINTENANCE LOG B 1...
Страница 150: ...3000 EXPRESS Hours Date Dealer Service Repairs MAINTENANCE LOG B 2...
Страница 151: ...3000 EXPRESS Hours Date Dealer Service Repairs MAINTENANCE LOG B 3...
Страница 152: ...3000 EXPRESS Hours Date Dealer Service Repairs MAINTENANCE LOG B 4...
Страница 153: ...3000 EXPRESS Hours Date Dealer Service Repairs MAINTENANCE LOG B 5...
Страница 154: ...3000 EXPRESS THIS PAGE WAS LEFT BLANK INTENTIONALLY...