7 Testing and Maintenance
58
NOTE
It is the responsibility of the facility operator, or their designee, to obtain reference values for recurring
safety and system tests. These reference values are the results of the first test cycles after an installation.
You may also purchase this service from Philips.
Testing Sequence
Here is a summary of the recommended sequence of testing:
NOTE
If any single test fails, testing must be discontinued immediately and the device under test must be
repaired or labeled as defective.
Combining or exchanging system components
Perform the system test
Service Event
Test Block(s) Required - Complete these tests
Содержание Avalon FM20
Страница 2: ......
Страница 6: ...6 ...
Страница 38: ...3 Installation Instructions 38 ...
Страница 46: ...4 Theory of Operation 46 ...
Страница 145: ...10 Repair and Disassembly 145 7 The top cover assembly is now separated from the bottom housing assembly ...
Страница 154: ...10 Repair and Disassembly 154 10 Take the new rear housing cover and place it in the position shown ...
Страница 155: ...10 Repair and Disassembly 155 11 Put the two halves of the display assembly together as shown ...
Страница 163: ...10 Repair and Disassembly 163 4 Turn over the top cover assembly and place it top down on a cloth or other soft surface ...
Страница 167: ...10 Repair and Disassembly 167 10 Remove the four screws holding the recorder chassis ...
Страница 169: ...10 Repair and Disassembly 169 12 Remove the RFI bracket 13 Lift out the recorder chassis ...
Страница 200: ...10 Repair and Disassembly 200 2 Remove the screws holding the metal shield 3 Remove the shield ...
Страница 254: ...12 Specifications 254 ...
Страница 259: ......
Страница 260: ...Part Number 453564541271 Published in Germany 11 14 453564541271 ...