2 Site Preparation
16
Site Preparation Responsibilities
Local Staff:
•
Ensure that all safety, environmental, and power requirements are met.
•
Provide power outlets.
•
Prepare mounts, and consult Philips for detailed mounting requirements.
•
Pull cables, install conduit, and install wall boxes.
Philips Personnel:
•
Provide the customer with the safety, environmental, and power requirements.
•
Assemble mounts as necessary.
•
Provide requirements for cabling.
Procedures for Local Staff
The following tasks must be completed before the procedures for Philips personnel may be started.
•
Providing power outlets:
– Provide a power outlet in the vicinity (1 m or 3 ft.) or any peripheral equipment.
WARNING
Only the power cables provided with the system may be used. For reasons of safety, power (mains)
extension cables or adapters shall not be used.
•
Preparing mounts, where ceiling, wall, or shelf mounts are required for mounting the equipment,
the customer is responsible for the following:
– Providing and installing all hardware which is required to install the mounting hardware
supplied by Philips as detailed in the installation notes.
– Making sure that all ceilings, walls, and mounting rails that supports mounting hardware are
suitable for their proposed load.
WARNING
It is the customer's responsibility to have the attachment of the mounting hardware to the ceiling, wall,
or mounting rail, and the construction of the ceiling, wall, or mounting rail evaluated for structural
integrity and compliance with all local, state, and any other required codes by a registered, professional,
structural and/or mechanical engineer.
Although considerable effort has been made to ensure the safety of the ceiling mount installation and
or mounting guidelines, it is to be understood that the installation itself is beyond the control of Philips
Medical Systems. Accordingly, Philips Medical Systems will not be responsible for the failure of any
such installation.
•
Providing conduit:
– Providing conduit and/or trunking of a sufficient cross-sectional area for the planned cables,
and possible future expansion (for additional components or systems).
– Providing and/or installing suitable wall boxes to accommodate the face plates.
•
Pulling cables
Содержание Avalon FM20
Страница 2: ......
Страница 6: ...6 ...
Страница 38: ...3 Installation Instructions 38 ...
Страница 46: ...4 Theory of Operation 46 ...
Страница 145: ...10 Repair and Disassembly 145 7 The top cover assembly is now separated from the bottom housing assembly ...
Страница 154: ...10 Repair and Disassembly 154 10 Take the new rear housing cover and place it in the position shown ...
Страница 155: ...10 Repair and Disassembly 155 11 Put the two halves of the display assembly together as shown ...
Страница 163: ...10 Repair and Disassembly 163 4 Turn over the top cover assembly and place it top down on a cloth or other soft surface ...
Страница 167: ...10 Repair and Disassembly 167 10 Remove the four screws holding the recorder chassis ...
Страница 169: ...10 Repair and Disassembly 169 12 Remove the RFI bracket 13 Lift out the recorder chassis ...
Страница 200: ...10 Repair and Disassembly 200 2 Remove the screws holding the metal shield 3 Remove the shield ...
Страница 254: ...12 Specifications 254 ...
Страница 259: ......
Страница 260: ...Part Number 453564541271 Published in Germany 11 14 453564541271 ...