
4. Monitoring the Card
4-8
April 2003
8799-A2-GB20-10
Test Status Messages
The Test Status messages in the following table appear in the right column of the
System and Test Status screen.
For information on testing, refer to
Chapter 5,
Testing
.
Performance Statistics
Performance statistics can assist you in determining the duration of specific
conditions and provide a historical context for problem detection and analysis.
Statistics are maintained for up to 96 15-minute intervals (24 hours).
Select a port to view its performance statistics. Port 1 is the default.
Use the applicable virtual function keys to page through the intervals and clear
statistics.
Select PgUp or PgDn to view more statistics.
Select ClrNear or ClrFar to clear the near- and far-end statistics to zero.
For G.703 statistics, select ClrStats to clear all statistics to zero.
Table 4-3.
Test Status Messages
Test Status Message
Meaning
511 Test Active, Pt.
n
A Send and Monitor 511 test is active on DSL Port
n.
DLB Test Active, Pt
n
A Data Terminal (DTE) Loopback (DLB) test is active on Port
n.
Lamp Test Active
The Lamp Test is active, causing the LEDs on the front panel to
light.
LLB Test Active, Pt
n
A DSL Line Loopback (LLB) test is active on Port
n.
No Test Active
No tests are currently running.
Remote LLB Dn
Active, Pt
n
A DSL Line Loopback (LLB) down command is being sent.
Remote LLB Up
Active, Pt
n
A DSL Line Loopback (LLB) up command is being sent.
RLB Test Active, Pt
n
A Repeater Loopback (RLB) test is active on Port
n.
Содержание Hotwire 8799
Страница 24: ...2 Using the Asynchronous Terminal Interface 2 10 April 2003 8799 A2 GB20 10...
Страница 68: ...5 Testing 5 10 April 2003 8799 A2 GB20 10...
Страница 144: ...C Cross Connecting Ports C 24 April 2003 8799 A2 GB20 10...
Страница 148: ...E Technical Specifications E 2 April 2003 8799 A2 GB20 10...
Страница 154: ...Index IN 6 April 2003 8799 A2 GB20 10...