PB
Press either the
< –EQV>
or
<+EQV >
soft key to change
the EQ voltage, following your battery manufacturer’s
recommendations. Note that the factory default EQ
voltage is set low, the same as the factory default Absorb
voltage. Press the
<NEXT>
soft key to view the
BATTERY
EQUALIZE Time
screen.
Press either the
<-HRS>
or
<+HRS>
soft key to set
the desired equalization time, up to a seven hour
maximum, always following your battery manufacturer’s
recommendations. Press the
<NEXT>
soft key to view
the battery equalization start screen.
Manual Mode (default mode)
• Press the
<START>
soft key to manually begin an
equalization cycle. To stop the cycle, press the
<STOP>
soft key.
•
EQ-MPPT
display indicates the FLEXmax 80 is trying to
reach the target equalize set point.
• Equalize time
EQ 0:00
in Hours:Minutes displays after
the equalize set point is reached.
• The incomplete equalization cycle continues into
the next day unless the FLEXmax 80 is powered off
or manually stopped. The remaining EQ time can be
viewed in the
Stats
menu.
• EQ cycle terminates when EQ time period is reached.
• After equalizing, an
EQ DONE
message displayed and
a
Float
cycle begins. This message remains displayed
until a soft key is pressed.
Press the
<AUTO>
soft key to view the auto equalization
screen.
BATTERY EQUALIZE
Time
01 Hours
EXIT NEXT -HRS +HRS
BATTERY EQUALIZE
Volts
15.0
EXIT NEXT -EQV +EQV
BATTERY EQUALIZE
1 Hours 15.0 Volts
Check water level
BACK AUTO START STOP
Содержание FLEXMAX 80
Страница 9: ...THE OUTBACK POWER SYSTEMS FLEXmax 80 Maximum Power Point Tracking Charge Controller...
Страница 13: ...12 Figure 2 Single Charge Controller wiring diagram with 24 volt PV array...
Страница 14: ...13 Figure 3 Charge Controller Wiring Diagram with an FX HUB 4 and an RTS...
Страница 15: ...14 Figure 4 Charge Controller with PV array ground fault protection wiring digram...
Страница 37: ...36 Figure 5 Diversion Load and AUX Wiring Set Up Illustrated...